Revision history of "Run Coordinator report: Fall 2018 w11"

From GlueXWiki
Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 11:27, 12 November 2018Deurpam (Talk | contribs). . (822 bytes) (+822). . (Created page with "We were scheduled to receive 161 hours of beam and received 104, with 98 of those acceptable. The largest period of downtime was caused by a vacuum pump failing in the photon...")