Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Planning for Experiment
Draft Outline Presentations (Feb 10)
- https://bluejeans.com/195964581 Bluejeans connection for Open Session
- Reviewers:
- Stepan Stepanyan (chair+muon detector)
- Alexandre Cansonne (Trigger)
- Brad Sawatzky (Tracking System -MWPC)
- Chris Keith (Target)
- Robin Wines (Installation)
- Mikhail Kostin (RadCon)
- Edy Nissen (Beamline)
- Javier Gomez (Observer)
- Ed Folts (Observer)
- Agenda
- 08:15-08:45 Executive session
- 08:45-09:35 (30+20) Overview of experiment and setup (Charges: 1, 2. 5, 8) -- Rory Miskimen
- 09:35-10:25 (30+20) Engineering design and installation of the platform and muon chambers (Charges: 2, 3, 4) -- Tim Whitlatch
- 10:25-10:45 Coffee break
- 10:45-11:15 (20+10) Project implementation, resources and schedule (Charges: 3, 6, 7, 9) -- Elton Smith
- 11:15-14:30 Lunch and Executive Session
- 14:30 Closeout
- ERR Final Report
- Addressing ERR Review Recommendations
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
- Move tagger microscope to cover 6 GeV coherent peak
Platform Design
Trigger Discussion
References:
- TOF trigger rate study with the upgraded TOF detector and optional lead shielding
- TOF clusters (Existing Trigger)
Documentation for Review
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020
- CPP wiki page
- NPP wiki page
- Draft Documents
- Drawings for support structure and iron absorbers
- Procedures for installation of muon detector