Difference between revisions of "CPP and NPP Readiness Review"
From GlueXWiki
(→Documentation for Review) |
(→Documentation for Review) |
||
Line 60: | Line 60: | ||
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/COO.pdf COO] | #* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/COO.pdf COO] | ||
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ERG.pdf ERG] | #* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ERG.pdf ERG] | ||
− | #* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD.pdf ESAD] | + | #* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD.pdf ESAD], [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD_mod.pdf ESAD version with muon detector] |
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/Draft_HallD_RSAD.pdf RSAD] | #* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/Draft_HallD_RSAD.pdf RSAD] | ||
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/D00000-01-06-P006_RevB.docx FCAL Dark Room Procedure] | #* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/D00000-01-06-P006_RevB.docx FCAL Dark Room Procedure] |
Revision as of 09:21, 8 February 2021
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Planning for Experiment
Draft Outline Presentations (Feb 10)
- https://bluejeans.com/195964581 Bluejeans connection for Open Session
- Reviewers:
- Stepan Stepanyan (chair+muon detector)
- Alexandre Cansonne (Trigger)
- Brad Sawatzky (Tracking System -MWPC)
- Chris Keith (Target)
- Robin Wines (Installation)
- Mikhail Kostin (RadCon)
- Edy Nissen (Beamline)
- Javier Gomez (Observer)
- Ed Folts (Observer)
- Agenda
- 08:15-08:45 Executive session
- 08:45-09:35 (30+20) Overview of Experiment and Setup (Charges: 1, 2. 5, 8) -- Rory Miskimen
- 09:35-10:25 (30+20) Engineering Design, Fabrication, Operation and Installation of CPP Hardware (Charges: 2, 3, 4) -- Tim Whitlatch
- 10:25-10:45 Coffee break
- 10:45-11:15 (20+10) Project implementation, resources and schedule (Charges: 3, 6, 7, 9) -- Elton Smith
- 11:15-14:30 Lunch and Executive Session
- 14:30 Closeout
- ERR Final Report
- Addressing ERR Review Recommendations
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
- Move tagger microscope to cover 6 GeV coherent peak
Documentation for Review
- PAC Documents
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020
- NPP Presentation to PAC 48 August 13, 2020
- TOF Trigger
- Draft Documents
- Released Drawings
- Installation Schedule
- Wiki Pages for further reference