Difference between revisions of "CPP and NPP Readiness Review"
From GlueXWiki
(→Draft Outline Presentations (February 10, 2021)) |
(→Outline Presentations (February 10, 2021)) |
||
Line 33: | Line 33: | ||
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4969 ERR Final Report, Feb 23, 2021] | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4969 ERR Final Report, Feb 23, 2021] | ||
− | * | + | * Point-by-point Response |
+ | * Timelines and Responsibilities | ||
+ | * Fabrication and Performance of the MWPC | ||
== Additions to Standard Equipment == | == Additions to Standard Equipment == |
Revision as of 16:25, 28 April 2021
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Planning for Experiment
Outline Presentations (February 10, 2021)
- https://bluejeans.com/195964581 Bluejeans connection for Open Session
- Reviewers:
- Stepan Stepanyan (chair+muon detector)
- Alexandre Cansonne (Trigger)
- Brad Sawatzky (Tracking System -MWPC)
- Chris Keith (Target)
- Robin Wines (Installation)
- Mikhail Kostin (RadCon)
- Edy Nissen (Beamline)
- Javier Gomez (Observer)
- Ed Folts (Observer)
- Agenda
- 08:15-08:45 Executive session
- 08:45-09:35 (30+20) Overview of Experiment and Setup (Charges: 1, 2. 5, 8) -- Rory Miskimen
- 09:35-10:25 (30+20) Engineering Design, Fabrication, Operation and Installation of CPP Hardware (Charges: 2, 3, 4) -- Tim Whitlatch
- 10:25-10:45 Coffee break
- 10:45-11:15 (20+10) Project implementation, resources and schedule (Charges: 3, 6, 7, 9) -- Elton Smith
- 11:15-14:30 Lunch and Executive Session
- 14:30 Closeout
- ERR Final Report, Feb 23, 2021
- Point-by-point Response
- Timelines and Responsibilities
- Fabrication and Performance of the MWPC
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
- Move tagger microscope to cover 6 GeV coherent peak
Documentation for Review
- PAC Documents
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020
- NPP Presentation to PAC 48 August 13, 2020
- TOF Trigger
- Draft Documents
- Released Drawings
- Installation Schedule
- Wiki Pages for further reference