Difference between revisions of "April 30, 2021 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 21: | Line 21: | ||
#** [https://logbooks.jlab.org/entry/3875062 Inspection on 4/28] | #** [https://logbooks.jlab.org/entry/3875062 Inspection on 4/28] | ||
#* Next steps in mirror process: (Justin) | #* Next steps in mirror process: (Justin) | ||
− | #** Borofloat received at JLab and mirrors | + | #** Borofloat received and checked at JLab and mirrors at Danny's for cutting |
− | #** Writeup of assembly procedure | + | #** Writeup of assembly procedure discussed last week |
+ | #*** After etching, large mirrors will be taped to strongback, where borofloat will be attached. Full strongback + mirror sandwich tested under water | ||
+ | #*** Narrow mirrors (3-segment and "wedge" mirrors) will be assembled on optical breadboards and tested under water before taping to strongback. | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin) | #* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin) |
Revision as of 09:50, 30 April 2021
Meeting Information
GlueX DIRC Meeting
Friday April 30, 2021
10:00 am, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Mirror prototype test plan (All)
- Discussion of prototypes and ongoing tests (Bill, All)
- Next steps in mirror process: (Justin)
- Borofloat received and checked at JLab and mirrors at Danny's for cutting
- Writeup of assembly procedure discussed last week
- After etching, large mirrors will be taped to strongback, where borofloat will be attached. Full strongback + mirror sandwich tested under water
- Narrow mirrors (3-segment and "wedge" mirrors) will be assembled on optical breadboards and tested under water before taping to strongback.
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status: all 8 batches nearly complete for REST reconstruction (Justin)
- Geometric reconstruction update
- Cherenkov PDF (Ahmed)
- FastDIRC update (Yunjie)
- AOB