Difference between revisions of "JEF meeting, April 22, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
+ | ** Status of summer students | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/budget/students.xlsx List of possible students and projects for this summer] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/task_list/task_list_fcal2_fabrication_v2.pdf FCAL2 fabrication task list] | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] <span style="color:#FF0000"> Grand total 320 (20 % of the total) </span> | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] <span style="color:#FF0000"> Grand total 320 (20 % of the total) </span> |
Revision as of 09:22, 22 April 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- Status of summer students
- Module fabrication -- Sasha
- Modules fabricated by Arshak and Sasha (list on Google Drive) Grand total 320 (20 % of the total)
- Fabricated modules in TEDF
- Status of fabrication
- Light Monitoring System -- Arshak
- COMCAL tests, TAC running, etc. -- Sasha
- Data analysis
- Simulations
- Workshops
- status DNP mini-symposium
- proposal ECT* workshop, form