Line 6: | Line 6: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
+ | ** Status of summer students | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/budget/students.xlsx List of possible students and projects for this summer] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/task_list/task_list_fcal2_fabrication_v2.pdf FCAL2 fabrication task list] | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] <span style="color:#FF0000"> Grand total 320 (20 % of the total) </span> | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] <span style="color:#FF0000"> Grand total 320 (20 % of the total) </span> | ||
Line 15: | Line 18: | ||
* Simulations | * Simulations | ||
* Workshops | * Workshops | ||
− | ** status | + | ** status mini-symposium at DNP 2022 fall meeting: DNP 2022 web site is https://tigers.phys.lsu.edu/dnp2022/ |
− | ** proposal ECT* workshop, [[:file:Call_for_2023_Project_Proposals.pdf | form]] | + | ** proposal ECT* (https://www.ectstar.eu/) workshop, [[:file:Call_for_2023_Project_Proposals.pdf | form]] |
+ | |||
+ | =Minutes= | ||
+ | Attendees: Arshak, Igal, Tegan, Bill, Sasha, Liping, Tim B., Jane, Jon, Phil, Olga, Susan, Azizah, S.T. | ||
+ | * Several students plan to come to the lab during the summer | ||
+ | ** 3 affiliated with GWU, 2 from Lamar, 3 from UNCW, 1 TBD from URegina | ||
+ | ** Sasha has identified several hardware tasks related to module fabrication | ||
+ | * Now up to 320 fabricated modules as of the meeting | ||
+ | * Relocation to new lab space some time in May? | ||
+ | * Arshak continuing to work on LMS development | ||
+ | ** Constructed DIY integrating sphere while we wait for the procurement of the real thing to proceed | ||
+ | ** New plexiglas sheet ordered | ||
+ | ** Plan for injecting light on each side is moving forward | ||
+ | *** Looking for commercially-available connects for inserting fibers, but may have to 3D print | ||
+ | ** Existing plexiglas for FCAL-1 needs to be modified | ||
+ | * Liping will go to Snowmass parallel meeting in mid May | ||
+ | * Susan to take the lead regarding application for a possible ECT* workshop next year (deadline is May 20, 2022) |
Latest revision as of 09:13, 29 April 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- Status of summer students
- Module fabrication -- Sasha
- Modules fabricated by Arshak and Sasha (list on Google Drive) Grand total 320 (20 % of the total)
- Fabricated modules in TEDF
- Status of fabrication
- Light Monitoring System -- Arshak
- COMCAL tests, TAC running, etc. -- Sasha
- Data analysis
- Simulations
- Workshops
- status mini-symposium at DNP 2022 fall meeting: DNP 2022 web site is https://tigers.phys.lsu.edu/dnp2022/
- proposal ECT* (https://www.ectstar.eu/) workshop, form
Minutes
Attendees: Arshak, Igal, Tegan, Bill, Sasha, Liping, Tim B., Jane, Jon, Phil, Olga, Susan, Azizah, S.T.
- Several students plan to come to the lab during the summer
- 3 affiliated with GWU, 2 from Lamar, 3 from UNCW, 1 TBD from URegina
- Sasha has identified several hardware tasks related to module fabrication
- Now up to 320 fabricated modules as of the meeting
- Relocation to new lab space some time in May?
- Arshak continuing to work on LMS development
- Constructed DIY integrating sphere while we wait for the procurement of the real thing to proceed
- New plexiglas sheet ordered
- Plan for injecting light on each side is moving forward
- Looking for commercially-available connects for inserting fibers, but may have to 3D print
- Existing plexiglas for FCAL-1 needs to be modified
- Liping will go to Snowmass parallel meeting in mid May
- Susan to take the lead regarding application for a possible ECT* workshop next year (deadline is May 20, 2022)