Difference between revisions of "August 10, 2022 FCAL Insert Installation Meeting"
From GlueXWiki
(→Minutes) |
(→Minutes) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
* Presented the attached presentation covering schedule,space, equipment and manpower | * Presented the attached presentation covering schedule,space, equipment and manpower | ||
− | + | ||
− | * Need to come up with a detailed plan for Lead glass unstacking, refurb and restack (Sasha) | + | * Need to come up with a detailed plan for Lead glass unstacking, refurb and module restack (Sasha) |
− | ** Materials needed | + | ** Materials needed (mylar, silicone sheets etc..) |
** Manpower required | ** Manpower required | ||
** Equipment needed (shelving, tooling etc) | ** Equipment needed (shelving, tooling etc) | ||
** Space needed | ** Space needed | ||
+ | ** include CCAL disassy and refurb modules | ||
+ | ** Cookie inspection? | ||
+ | ** Include testing of all crystals inside hall | ||
+ | ** Include additional dividers for crystals | ||
+ | ** Help from detector support group? | ||
+ | ** FCAL used teflon sheet to slide upper modules into place | ||
* Discussion on attaching racks to platform - Tim to investigate | * Discussion on attaching racks to platform - Tim to investigate | ||
* Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie | * Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie | ||
* Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot) | * Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot) | ||
+ | ** Need to uncable DIRC and reroute gas lines | ||
+ | ** Include the module plan from Sasha | ||
+ | ** Include addition of AC power on south side of platform | ||
* Develop Cable map and labelling (Fernado) | * Develop Cable map and labelling (Fernado) | ||
** Determine space where cables can be labelled as well as manpower | ** Determine space where cables can be labelled as well as manpower | ||
− | ** Investigate if additional trays are needed for additional crystal signal cables | + | ** Investigate if additional cable trays are needed for additional crystal signal cables |
** will signal cables be light weight and thin? | ** will signal cables be light weight and thin? | ||
** Cabling mock up for center section | ** Cabling mock up for center section | ||
+ | ** How many new racks are needed? | ||
+ | * Matt to go through spare parts he has and send needed stuff to JLAB. | ||
+ | ** plastic crates for modules | ||
+ | ** assembled modules | ||
+ | * Need to include Fernando in future meetings | ||
+ | * Set up periodic meetings to prepare |
Latest revision as of 08:04, 15 August 2022
Meeting Time and Place
Wednesday August 10,2022 9:30am At Jefferson Lab, Hall D Counting House and on Teams
Agenda
- Discuss Schedule, space, manpower and equipment needs
Minutes
- Presented the attached presentation covering schedule,space, equipment and manpower
- Need to come up with a detailed plan for Lead glass unstacking, refurb and module restack (Sasha)
- Materials needed (mylar, silicone sheets etc..)
- Manpower required
- Equipment needed (shelving, tooling etc)
- Space needed
- include CCAL disassy and refurb modules
- Cookie inspection?
- Include testing of all crystals inside hall
- Include additional dividers for crystals
- Help from detector support group?
- FCAL used teflon sheet to slide upper modules into place
- Discussion on attaching racks to platform - Tim to investigate
- Maybe a good idea to do a 10x10 stack up to practice and see where the difficulties lie
- Develop a very detailed procedure and schedule for the entire project including manpower (Tim/Scot)
- Need to uncable DIRC and reroute gas lines
- Include the module plan from Sasha
- Include addition of AC power on south side of platform
- Develop Cable map and labelling (Fernado)
- Determine space where cables can be labelled as well as manpower
- Investigate if additional cable trays are needed for additional crystal signal cables
- will signal cables be light weight and thin?
- Cabling mock up for center section
- How many new racks are needed?
- Matt to go through spare parts he has and send needed stuff to JLAB.
- plastic crates for modules
- assembled modules
- Need to include Fernando in future meetings
- Set up periodic meetings to prepare