Difference between revisions of "JEF meeting, May 19, 2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 23: | Line 23: | ||
**: 42 modules fabricated using 'low quality' crystals for the stacking mockup and 'crunch' tests. | **: 42 modules fabricated using 'low quality' crystals for the stacking mockup and 'crunch' tests. | ||
** [https://docs.google.com/presentation/d/18Awobg1SA4b71q87fH1zgfFw8CjoUXUvET_VIy279fI/edit?usp=sharing Report from students] | ** [https://docs.google.com/presentation/d/18Awobg1SA4b71q87fH1zgfFw8CjoUXUvET_VIy279fI/edit?usp=sharing Report from students] | ||
− | * '''Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa. | + | * '''Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx] ''' |
**: 160 modules checked [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_shelves.jpg] | **: 160 modules checked [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_shelves.jpg] | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Arshak | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Arshak |
Revision as of 09:24, 19 May 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation for the ECAL installation [1]
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals:
- Received 40 crystals from CRYTUR [2], 10 have been recently sent out. Remaining 45 crystals.
- Wrapped crystals: 10
- Available for wrapping: 10 SICCAS + 5 CRYTUR = 15
- George (DSG group) finished with preshaping.
- More than 400 long signal cables received, can start checking, bundling, labeling (receive labeling machine in a couple of weeks)
- Procurement parts for the LMS
- 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
- Receive first batch of donats for the LMS, evrth. looks Ok. Will receive all of them in a couple of weeks (start working on the LMS)
- Crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1542
- 9 modules fabricated during last week
- Available for fabrication: 26
- 42 modules fabricated using 'low quality' crystals for the stacking mockup and 'crunch' tests.
- Report from students
- Fabricated modules: Total 1542
- Visual inspections of fabricated modules [3]
- 160 modules checked [4]
- Testing of PMT dividers -- Sasha / Vlad / Arshak
- FCAL2 modules with dividers installed on the CCAL [5]
- Met with Vlad P. on Tuesday. Fine tuned the divider circuit. Checking/tuning an amplifier; Chris S. ordered some OPS.
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [6]
- Discussion of the FCAL2 installation procedures [7]
- Final mapping of low-voltage cables
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Simulations/Analysis