Difference between revisions of "Solenoid Coil Test in Test Lab"
From GlueXWiki
m |
m |
||
Line 5: | Line 5: | ||
* Notes: | * Notes: | ||
+ | ** Wayne is designing overall layout. | ||
** Area in the test lab is 20'6" x 25'9", currently filled with coils and coil parts. | ** Area in the test lab is 20'6" x 25'9", currently filled with coils and coil parts. | ||
** May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas). | ** May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas). | ||
Line 10: | Line 11: | ||
** Must maintain clear areas around racks and power supply, and cannot block pedestrian walkways. | ** Must maintain clear areas around racks and power supply, and cannot block pedestrian walkways. | ||
** Platform is 172" x 160", cryo can will sit on top. | ** Platform is 172" x 160", cryo can will sit on top. | ||
+ | ** Platform must be removed to swap coils, and all connections to it must be broken. | ||
** Area has two cranes, but need both (and spreader bar) to lift heaviest yoke (45 tons). | ** Area has two cranes, but need both (and spreader bar) to lift heaviest yoke (45 tons). | ||
** Need come-alongs and anchors to move yokes and coils along rails. | ** Need come-alongs and anchors to move yokes and coils along rails. | ||
+ | |||
* '''To Do:''' | * '''To Do:''' | ||
Line 18: | Line 21: | ||
** Distribute Floyd's B field map for single coil, no cladding - George | ** Distribute Floyd's B field map for single coil, no cladding - George | ||
** Determine location of all components - Wayne | ** Determine location of all components - Wayne | ||
− | |||
− | |||
− | |||
** Investigate sensitivity of electronic equipment to B fields - Elliott | ** Investigate sensitivity of electronic equipment to B fields - Elliott | ||
− | + | ** Find spreader bar - George | |
− | + | ||
− | ** | + | |
− | + | ||
− | + | ||
− | + | ||
Line 33: | Line 28: | ||
* Notes: | * Notes: | ||
+ | ** Platform borrowed from Hall A. | ||
+ | ** Rails currently at IU. | ||
+ | ** Have or can borrow all material moving equipment, or will contract out to rigging firm. | ||
+ | ** Have or can borrow all tools needed. | ||
+ | |||
* '''To Do:''' | * '''To Do:''' | ||
+ | ** Design structures and mechanical components, route cables and cryo piping, etc. - Wayne | ||
+ | ** Arrange for piping designer - George | ||
+ | *** Design piping to vent N2. | ||
+ | *** Design warm and cold He supply/return systems, LN2 supply system. | ||
+ | ** Order warm He and N2 piping - ? | ||
+ | ** Retrieve rails from IU - ? | ||
Line 42: | Line 48: | ||
* '''To Do:''' | * '''To Do:''' | ||
+ | ** Verify we have all cryo transfer lines and U-tubes - Mark S | ||
+ | ** Verify we can borrow heat exchanger from Hall A - George | ||
Line 59: | Line 67: | ||
* Notes: | * Notes: | ||
** Micro-review of PLC vendor choice completed, waiting for report. | ** Micro-review of PLC vendor choice completed, waiting for report. | ||
+ | ** Need cryo, electrical, mechanical, and operations reviews. | ||
+ | |||
* '''To Do:''' | * '''To Do:''' | ||
− | ** Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review | + | ** Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review - Elliott |
+ | ** Write appropriate documentation - George, Mark S, Wayne and Elliott | ||
+ | ** Set up all reviews - George and Elliott |
Revision as of 14:14, 18 June 2009
Notes and to-do lists for the solenoid coil tests this summer and fall.
Test Area
- Notes:
- Wayne is designing overall layout.
- Area in the test lab is 20'6" x 25'9", currently filled with coils and coil parts.
- May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas).
- May need extra space for large power supply (6' x 5') and to avoid placing controls racks in large B field.
- Must maintain clear areas around racks and power supply, and cannot block pedestrian walkways.
- Platform is 172" x 160", cryo can will sit on top.
- Platform must be removed to swap coils, and all connections to it must be broken.
- Area has two cranes, but need both (and spreader bar) to lift heaviest yoke (45 tons).
- Need come-alongs and anchors to move yokes and coils along rails.
- To Do:
- Look into getting space in adjacent areas - George
- Look into possibility of locating computer in control room - Elliott
- Distribute Floyd's B field map for single coil, no cladding - George
- Determine location of all components - Wayne
- Investigate sensitivity of electronic equipment to B fields - Elliott
- Find spreader bar - George
Infrastructure
- Notes:
- Platform borrowed from Hall A.
- Rails currently at IU.
- Have or can borrow all material moving equipment, or will contract out to rigging firm.
- Have or can borrow all tools needed.
- To Do:
- Design structures and mechanical components, route cables and cryo piping, etc. - Wayne
- Arrange for piping designer - George
- Design piping to vent N2.
- Design warm and cold He supply/return systems, LN2 supply system.
- Order warm He and N2 piping - ?
- Retrieve rails from IU - ?
Components
- Notes:
- To Do:
- Verify we have all cryo transfer lines and U-tubes - Mark S
- Verify we can borrow heat exchanger from Hall A - George
Staging
- Notes:
- Will instrument controls racks in F117, then move to Test Lab.
- Will instrument for final 4-coil system.
- To Do:
- Rearrange F117 - Mark S and Beni
- Get and move 3 racks into F117 - Mark S
Reviews
- Notes:
- Micro-review of PLC vendor choice completed, waiting for report.
- Need cryo, electrical, mechanical, and operations reviews.
- To Do:
- Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review - Elliott
- Write appropriate documentation - George, Mark S, Wayne and Elliott
- Set up all reviews - George and Elliott