Difference between revisions of "Coil Test Weekly Meeting 21-Jan-2011"

From GlueXWiki
Jump to: navigation, search
m
m
 
(One intermediate revision by the same user not shown)
Line 10: Line 10:
  
 
* Update on installation progress
 
* Update on installation progress
* Coil taps and Dataforth system
+
* Coil taps and Dataforth system - Elliott
 
** voltage attenuators?
 
** voltage attenuators?
 
** input impedance and overcurrent protection resistor size
 
** input impedance and overcurrent protection resistor size
 
* What to do about jumpers in connector box - Jonathan, Elliott
 
* What to do about jumpers in connector box - Jonathan, Elliott
 +
* Danfysik offset - Mark, Cody
 
* [[For_the_second_coil|To-do list]] for the next coil
 
* [[For_the_second_coil|To-do list]] for the next coil
 
* Coil 3 strategy
 
* Coil 3 strategy

Latest revision as of 18:48, 20 January 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 21-Jan-2011 9:30 am ARC 428


Agenda

  • Update on installation progress
  • Coil taps and Dataforth system - Elliott
    • voltage attenuators?
    • input impedance and overcurrent protection resistor size
  • What to do about jumpers in connector box - Jonathan, Elliott
  • Danfysik offset - Mark, Cody
  • To-do list for the next coil
  • Coil 3 strategy
  • Coil 2 repair status
  • Status of abstract submission and paper - George
  • Preparing for moving into the hall