Difference between revisions of "Coil Test Weekly Meeting 25-Mar-2011"
From GlueXWiki
m |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
===Solenoid Coil Test Weekly Meeting=== | ===Solenoid Coil Test Weekly Meeting=== | ||
+ | |||
+ | |||
+ | '''This meeting was canceled!''' | ||
+ | |||
Line 25: | Line 29: | ||
** hardware and software requirements | ** hardware and software requirements | ||
* [[For_the_third_coil|To-do list]] for the next coil | * [[For_the_third_coil|To-do list]] for the next coil | ||
+ | ** measure UPS lifetime under operating conditions | ||
* Coil 2 repair status | * Coil 2 repair status | ||
* [http://irmis.sourceforge.net IRMIS] | * [http://irmis.sourceforge.net IRMIS] | ||
* Preparing for moving into the hall | * Preparing for moving into the hall |
Latest revision as of 17:26, 28 March 2011
Solenoid Coil Test Weekly Meeting
This meeting was canceled!
Location and Time
- Fri 25-Mar-2011 9:30 am ARC 231
NOTE: we are back to ARC 231 again, hopefully for good!
Agenda
- Coil 4 removal and Coil 3 repair and installation status
- Improvements needed for coil 3
- Danfysik power transistor
- balancing quench detector given new inductance calculation and tap locations
- document trip chains
- trip sequence diagnosis system
- slow dump still not working
- new wiring
- PLC system improvements
- additional licenses and modules
- New VME-based fast DAQ system
- hardware and software requirements
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- Coil 2 repair status
- IRMIS
- Preparing for moving into the hall