Difference between revisions of "Aug 11, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 5: Line 5:
 
# Send Jim the dxf file of the U board with the new capacitors to check mechanical fit. (Chris)
 
# Send Jim the dxf file of the U board with the new capacitors to check mechanical fit. (Chris)
 
# Hood in EEL 126 is being removed (Jack will check on status)
 
# Hood in EEL 126 is being removed (Jack will check on status)
 +
# Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:03, 4 August 2011

Action Items from previous meetings

  1. Add hardware voltage limits to bias circuit (Jack)
  2. Reset devices when communication errors are encountered in control loop (Yi)
  3. Send Jim the dxf file of the U board with the new capacitors to check mechanical fit. (Chris)
  4. Hood in EEL 126 is being removed (Jack will check on status)
  5. Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (Carl and Yi)
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)

Minutes

Attending: