* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1537 Conducting Epoxy Order Schedule] | * [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1537 Conducting Epoxy Order Schedule] | ||
− | * [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final Drawings] | + | * [http://www.jlab.org/~vgr/CDC%20Design%202010/ Final CDC Drawings (original repository, viewable from JLab only)] |
+ | * [https://userweb.jlab.org/~vgr/ Final CDC Drawings (for the later stages of construction)] | ||
==== Photographs ==== | ==== Photographs ==== |
Revision as of 13:32, 29 September 2011
Contents
The GlueX CDC
Overview
Construction
- CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
- Details of the CDC Construction
- Submitted Monthly Reports
- Log of Construction Complications
- The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.
Fabrication Documentation
- Assembly documents
- Final
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)
- End plate Alignment
- Straw Preparation (clean & trim)
- add final straw assembly
- Straw Insertion
- add final outer hub and gas lines and shell installation
- Wire Stringing Details
- Summary of Tests
- Document describing the measurement of wire tensions
- Preliminary
- Final
- QA Documents
Production Documents
- Conducting Epoxy Order Schedule
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)