Difference between revisions of "Jan 17, 2012 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 28: | Line 28: | ||
# Review of Action Items | # Review of Action Items | ||
# Monitoring. | # Monitoring. | ||
+ | #* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1891 First Results with UV LEDS] | ||
# FCAL | # FCAL | ||
## Construction Status: mechanical, bases (notes from Matt) | ## Construction Status: mechanical, bases (notes from Matt) |
Revision as of 09:54, 17 January 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
- Send additional SiPMs to Athens for tests (Elton). Electronics is being prepared, should be ready by next week sometime.
-
Measure stability of light intensity as a function of time. -
Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests.
- FCAL
-
Send IU the drawings for the FCAL welded frame. (Tim)Drawings are being signed today and will be forwarded to IU.
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Beam tests in Hall B (John)
- BCAL
- 2006 Beam test analysis at forward angles: [1]
- BCAL Beam Tests 2012
- SiPM PDE extraction at Regina
- USM update
- TDR update
- We need to start revising our section
- Simulations/Reconstruction
- Any other business
Minutes
Attending: