Difference between revisions of "Jan 17, 2012 Calorimetry"
From GlueXWiki
(→Minutes) |
(→Minutes) |
||
Line 52: | Line 52: | ||
# Monitoring. | # Monitoring. | ||
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1891 First Results with UV LEDS] | #* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1891 First Results with UV LEDS] | ||
+ | #* Tested UV LED and it performs similar to other light colors. Uniformity seems to be more uniform over a larger area. | ||
# FCAL | # FCAL | ||
## Construction Status: mechanical, bases (notes from Matt) | ## Construction Status: mechanical, bases (notes from Matt) | ||
Line 64: | Line 65: | ||
##* Latest batch with conformal coating was horrible and have been returned to the vendor. | ##* Latest batch with conformal coating was horrible and have been returned to the vendor. | ||
## Beam tests in Hall B (John) | ## Beam tests in Hall B (John) | ||
+ | ##* Gains are balanced, checking that the procedure is robust | ||
+ | ##* Detector is aligned relative to small remote paddle. | ||
+ | ##* Next: reduce size of remote paddle, move detector down to floor, merge DAQ with Hall B tagger to check electron energy | ||
+ | ##* Resolution is about deltaE/E ~ 22% | ||
# BCAL | # BCAL | ||
## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1887 2006 Beam test analysis at forward angles] | ## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1887 2006 Beam test analysis at forward angles] |
Revision as of 16:15, 17 January 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
[hide]Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
- Send additional SiPMs to Athens for tests (Elton). Electronics is being prepared, should be ready by next week sometime.
-
Measure stability of light intensity as a function of time. -
Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests.
- FCAL
-
Send IU the drawings for the FCAL welded frame. (Tim)Drawings are being signed today and will be forwarded to IU.
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Beam tests in Hall B (John)
- BCAL
- 2006 Beam test analysis at forward angles: [1]
- BCAL Beam Tests 2012
- SiPM PDE extraction at Regina
- Characterization studies of silicon photomultipliers NIM A620 (2010) 217 (Link for JLab)
- USM update
- TDR update
- We need to start revising our section
- Simulations/Reconstruction
- Any other business
Minutes
Attending: David, Tim, Beni, John L., John D., Elton (JLab); Will, Serguei (USM); Zisis, George, Andrei (UofR); George, Christina (Athens).
- Announcements
- Review of Action Items
- Monitoring.
- First Results with UV LEDS
- Tested UV LED and it performs similar to other light colors. Uniformity seems to be more uniform over a larger area.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Mechanical includes outer welded structure and inner stair step clamps for glass
- Inner parts are being fabricated in the IU shop
- Outer welded structure drawing package is out for bids by outside contractor
- PMTs are being glued to light guides. Have glued about 700, and tested about 600. Tested all new tubes, about 450. 3 failures
- Tested about 150 from the old pmts, 2 cracked windows, 1 failure
- Concern about the cracked windows. Slow down and do more careful tests with 20-30 pmts. Concern about whether the type of glass is different between old and new, but could be aging.
- Status of CW bases. Comm boards completed. Multiplier board, which generate the HV
- Fabrication without conformal coating are mostly resolved
- Latest batch with conformal coating was horrible and have been returned to the vendor.
- Beam tests in Hall B (John)
- Gains are balanced, checking that the procedure is robust
- Detector is aligned relative to small remote paddle.
- Next: reduce size of remote paddle, move detector down to floor, merge DAQ with Hall B tagger to check electron energy
- Resolution is about deltaE/E ~ 22%
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- 2006 Beam test analysis at forward angles
- Presenting data at small angles from the Hall B beam test. Recall we tested a full length, but rectangular cross section and blue HiTech fibers
- Map angle dependence of resolution (Stamatis' thesis).
- Resolution degrades from about 5.5/sqrt(E) to 7.2/sqrt(E).
- BCAL Beam Tests 2012
- SiPM PDE extraction at Regina
- Characterization studies of silicon photomultipliers NIM A620 (2010) 217 (Link for JLab)
- 2006 Beam test analysis at forward angles
- USM update
- TDR update
- We need to start revising our section
- Simulations/Reconstruction
- Any other business