Difference between revisions of "Mar 13, 2012 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 44: | Line 44: | ||
=Minutes= | =Minutes= | ||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Monitoring | ||
+ | # Calibration of Calorimeters | ||
+ | # FCAL | ||
+ | ## Construction Status | ||
+ | ## [[2011 Hall B FCAL Beam Test]] (John) | ||
+ | # BCAL | ||
+ | ## [[BCAL Beam Tests 2012]] | ||
+ | ## [[SiPM Database]] (Yi) | ||
+ | # USM update | ||
+ | ## Production Manager Report (Javiera) | ||
+ | ## [https://halldweb1.jlab.org/wiki/images/c/c8/USMUpdateStage3_20120313.pdf Stage 3 update (Alam)] | ||
+ | ## Update on lightguide production (Iñaki) | ||
+ | # TDR update | ||
+ | ## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ||
+ | ## We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. | ||
+ | # Simulations/Reconstruction | ||
+ | ##[https://halldweb1.jlab.org/wiki/images/1/1e/Uofr_sampltable_meeting120313.pdf Status of Sampling Table Generation] (Andrei and Irina) | ||
+ | # Any other business |
Revision as of 15:15, 13 March 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
-
Send additional SiPMs to Athens for tests (Elton).Shipment has been prepared and permission from DOE has been requested
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- Calibration of Calorimeters
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- USM update
- Production Manager Report (Javiera)
- Stage 3 update (Alam)
- Update on lightguide production (Iñaki)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Simulations/Reconstruction
- Status of Sampling Table Generation (Andrei and Irina)
- Any other business
Minutes
- Announcements
- Review of Action Items
- Monitoring
- Calibration of Calorimeters
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- USM update
- Production Manager Report (Javiera)
- Stage 3 update (Alam)
- Update on lightguide production (Iñaki)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Simulations/Reconstruction
- Status of Sampling Table Generation (Andrei and Irina)
- Any other business