Difference between revisions of "Jun 19, 2012 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
Line 18: | Line 18: | ||
# Cables | # Cables | ||
− | #* Establish cabling for Bcal and Fcal into racks | + | #* <strike> Establish cabling for Bcal and Fcal into racks </strike> Lists have been sent to Fernando. Still need to double check the lists. |
# Mechanical | # Mechanical | ||
#* Check features in Fcal support structure for cable passages and plexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) | #* Check features in Fcal support structure for cable passages and plexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) |
Revision as of 13:36, 19 June 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Cables
-
Establish cabling for Bcal and Fcal into racksLists have been sent to Fernando. Still need to double check the lists.
-
- Mechanical
- Check features in Fcal support structure for cable passages and plexiglas support, and space between window frames on glass and plexiglass (Elton, Tim)
- Monitoring
-
Check status of monitoring control boards at JLab (David).
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- JLab bench testing (Tara/David?)
- LED system on Mini BCAL
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- Cosmics at Regina
- Cosmics run plan (SiPMs) & LEDs at JLab
- Update on BCAL Beam Tests 2012
- SiPM Bias and Board Amplification Discussion
- USM update
- SiPM Update (Javiera)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- Any other business
Minutes
Attendees: Elton, David, Beni, Tara, Tim, Eugene (JLab); Zisis, Andrei (UofR); Javiera, Will, Hayk, Serguei (USM); Matt (IU); Christina, George, Pavlos, Stratos (Athens)
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- JLab bench testing (Tara/David?)
- LED system on Mini BCAL
- FCAL
- Construction Status
- 2011 Hall B FCAL Beam Test (John)
- BCAL
- Cosmics at Regina
- Cosmics run plan (SiPMs) & LEDs at JLab
- Update on BCAL Beam Tests 2012
- SiPM Bias and Board Amplification Discussion
- USM update
- SiPM Update (Javiera)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- Any other business