Difference between revisions of "July 5, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Tentative Agenda) |
||
Line 11: | Line 11: | ||
# Action Items | # Action Items | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
− | |||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
+ | #* SiPMs assignment for new boards | ||
# Mechanical assembly (Scot) | # Mechanical assembly (Scot) | ||
# Mechanical (Jim) | # Mechanical (Jim) |
Revision as of 07:25, 5 July 2012
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
- Review Fcal LED and controller monitoring boards (Fernando)
- Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
Minutes
Attending: