Difference between revisions of "July 5, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(Created page with "== Action Items from previous meetings == # Develop front and back views of jumper sheets. Also get latest version of drawings (Jack) # Check into AC units based on Peltier cool...") |
(→Minutes) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Action Items from previous meetings == | == Action Items from previous meetings == | ||
− | # Develop front and back views of jumper sheets. | + | # Develop front and back views of jumper sheets. (Jack) |
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando) | # Check into AC units based on Peltier coolers for SiPM production tests (Fernando) | ||
− | |||
# Review Fcal LED and controller monitoring boards (Fernando) | # Review Fcal LED and controller monitoring boards (Fernando) | ||
+ | # Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) | ||
== Tentative Agenda == | == Tentative Agenda == | ||
Line 11: | Line 11: | ||
# Action Items | # Action Items | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
− | |||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
+ | #* SiPMs assignment for new boards | ||
# Mechanical assembly (Scot) | # Mechanical assembly (Scot) | ||
# Mechanical (Jim) | # Mechanical (Jim) | ||
Line 21: | Line 21: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending:Jack, Nick, Chris, Elton, Jim, Eugene |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # SiPM production testing (everyone) | ||
+ | #* SiPMs assignment for new boards | ||
+ | #* Decided that a "random" distribution of SiPMs might be best for this set of boards. | ||
+ | # Mechanical (Jim) | ||
+ | #* Glue is in for RTD and Cooling tubes | ||
+ | #* Converting SiPM machined tray to molded part, which includes bosses | ||
+ | #* Joseph is putting together box for testing the readout. | ||
+ | #* Chiller: Check range of temperatures can cool SiPM in the range of 5 - 60 deg C. (The higher temperatures are needed for annealing the SiPMs) | ||
+ | # Temperature compensation (Jack) | ||
+ | #* Has code operational that can be used to determine overlaps between jumper settings. He will coordinate with Yi. | ||
+ | #* Also starting to develop the front and back views for jumper settings. | ||
+ | # Preamp-summing (Chris) | ||
+ | #* All 4000 populated U-boards are completed | ||
+ | #* Transition boards and thermistor boards (production) have been ordered | ||
+ | #* All HFL and UFL cables are on order and most are in but not all | ||
+ | #* The two readout boards are out to be populated, expected in about 10 days. | ||
+ | #* Thermal mats need to be ordered. | ||
+ | #* Cooling loops need to be brazed in. | ||
+ | #* 14-pin trim trio connectors are in, replacing the three previous connectors | ||
+ | #* The circuit board and micro-Dsub connector for the monitoring board needs to be made. Chris and Jim will discuss after the meeting. | ||
+ | # Light guide gluing setup | ||
+ | #* The vent hoods are being fabricated | ||
+ | #* Light guide production has been delayed due to a broken part in the milling machine. Light guides are now expected in a couple of weeks. |
Latest revision as of 16:20, 5 July 2012
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
- Review Fcal LED and controller monitoring boards (Fernando)
- Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
Minutes
Attending:Jack, Nick, Chris, Elton, Jim, Eugene
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Decided that a "random" distribution of SiPMs might be best for this set of boards.
- Mechanical (Jim)
- Glue is in for RTD and Cooling tubes
- Converting SiPM machined tray to molded part, which includes bosses
- Joseph is putting together box for testing the readout.
- Chiller: Check range of temperatures can cool SiPM in the range of 5 - 60 deg C. (The higher temperatures are needed for annealing the SiPMs)
- Temperature compensation (Jack)
- Has code operational that can be used to determine overlaps between jumper settings. He will coordinate with Yi.
- Also starting to develop the front and back views for jumper settings.
- Preamp-summing (Chris)
- All 4000 populated U-boards are completed
- Transition boards and thermistor boards (production) have been ordered
- All HFL and UFL cables are on order and most are in but not all
- The two readout boards are out to be populated, expected in about 10 days.
- Thermal mats need to be ordered.
- Cooling loops need to be brazed in.
- 14-pin trim trio connectors are in, replacing the three previous connectors
- The circuit board and micro-Dsub connector for the monitoring board needs to be made. Chris and Jim will discuss after the meeting.
- Light guide gluing setup
- The vent hoods are being fabricated
- Light guide production has been delayed due to a broken part in the milling machine. Light guides are now expected in a couple of weeks.