Difference between revisions of "2013-01-23"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday January 23, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == ...") |
(→Reports from Technical Groups) |
||
Line 43: | Line 43: | ||
** Calorimetry [[Jan 15, 2013 Calorimetry|January 15, 2013]] | ** Calorimetry [[Jan 15, 2013 Calorimetry|January 15, 2013]] | ||
** BCAL Readout [[Jan 22,2013 Readout|January 22, 2013]] | ** BCAL Readout [[Jan 22,2013 Readout|January 22, 2013]] | ||
− | * Tracking [[January 16, 2013 | + | * Tracking [[January 16, 2013 Tracking CDC/FDC| January 16, 2013]] |
** CDC | ** CDC | ||
** FDC | ** FDC |
Revision as of 11:58, 23 January 2013
Contents
[hide]Meeting Time and Place
The meeting will be on Wednesday January 23, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Next Monthly Installation Meetings in January.
- Collaboration Meeting, February 21-23
- Video Conference Systems
- Conferences in 2013
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
Reports from Technical Groups
- Calorimeters
- Calorimetry January 15, 2013
- BCAL Readout January 22, 2013
- Tracking January 16, 2013
- CDC
- FDC
- PID
- TOF December 6, 2012
- Start Counter November 29, 2012
- PID Upgrades November 2, 2012
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation November 12, 2012 Installation
- Electronics
- Technical Design Report
- Trigger January 16, 2013
- DAQ/Monitoring/Controls January 16, 2013
- Offline
- Software Meeting January 9, 2013
- Photon Beam and Tagger January 7, 2013
- Physics January 14, 2013