Difference between revisions of "May 9, 2013 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 1: Line 1:
 
== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)\
+
# Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)
 +
# Order second "half" top plate and modify tool for single replacement (Jim)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 12:19, 3 May 2013

Action Items from previous meetings

  1. Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)
  2. Order second "half" top plate and modify tool for single replacement (Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Light guides (Tina)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Electronic boards and SiPM sorting (Fernando and Chris)

Minutes

Attending: