Difference between revisions of "May 9, 2013 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 1: | Line 1: | ||
== Action Items from previous meetings == | == Action Items from previous meetings == | ||
− | # Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic) | + | # Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic) |
+ | # Order second "half" top plate and modify tool for single replacement (Jim) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 12:19, 3 May 2013
Action Items from previous meetings
- Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)
- Order second "half" top plate and modify tool for single replacement (Jim)
Tentative Agenda
- Announcements
- Action Items
- Light guides (Tina)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Electronic boards and SiPM sorting (Fernando and Chris)
Minutes
Attending: