Difference between revisions of "Controls Meeting 23-Jan-2014"
From GlueXWiki
(→Agenda) |
|||
Line 4: | Line 4: | ||
* Minutes from previous meeting [[Controls Meeting 9-Jan-2014]] | * Minutes from previous meeting [[Controls Meeting 9-Jan-2014]] | ||
* UPS requirements for Hall D | * UPS requirements for Hall D | ||
− | * | + | ** [[media:PLClayoutInHallD.xlsx | Total maximum power consumed by PLC, location in the hall]] (Dave) |
− | * | + | ** Total maximum power consumed by solenoid controls, location in the hall (Yi) |
− | * | + | ** Total maximum power consumed by motor controls, location in the hall (Hovanes) |
− | * | + | ** Total maximum power consumed by network switches, location in the hall (Hovanes) |
− | * | + | ** Expected power usage and required time duration during power failure for PLC device (Dave) |
− | * | + | ** Expected power usage and required time duration during power failure for solenoid controls (Yi) |
+ | ** Expected power usage and required time duration during power failure for motor controls (Hovanes) | ||
+ | ** Expected power usage and required time duration during power failure for network switches (Hovanes) | ||
==Time/Location== | ==Time/Location== | ||
− | |||
9:30AM Thurs 23-Jan-2014 CC A110 | 9:30AM Thurs 23-Jan-2014 CC A110 |
Revision as of 10:26, 23 January 2014
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 9-Jan-2014
- UPS requirements for Hall D
- Total maximum power consumed by PLC, location in the hall (Dave)
- Total maximum power consumed by solenoid controls, location in the hall (Yi)
- Total maximum power consumed by motor controls, location in the hall (Hovanes)
- Total maximum power consumed by network switches, location in the hall (Hovanes)
- Expected power usage and required time duration during power failure for PLC device (Dave)
- Expected power usage and required time duration during power failure for solenoid controls (Yi)
- Expected power usage and required time duration during power failure for motor controls (Hovanes)
- Expected power usage and required time duration during power failure for network switches (Hovanes)
Time/Location
9:30AM Thurs 23-Jan-2014 CC A110