Difference between revisions of "2014-04-16"
From GlueXWiki
(→Reports from Technical Groups) |
(→Reports from Technical Groups) |
||
Line 50: | Line 50: | ||
** Data Challenge Meeting [[GlueX Data Challenge Meeting, April 11, 2014|April 11, 2014]] | ** Data Challenge Meeting [[GlueX Data Challenge Meeting, April 11, 2014|April 11, 2014]] | ||
*** [https://docs.google.com/spreadsheets/d/1qvF9B-76gr8NdsTKsO17jqL0qc5OXqK46JluvXnJ98k/edit?usp=sharing Event Tally Board] | *** [https://docs.google.com/spreadsheets/d/1qvF9B-76gr8NdsTKsO17jqL0qc5OXqK46JluvXnJ98k/edit?usp=sharing Event Tally Board] | ||
− | *** [[Job History at JLab]] | + | *** [[Media:Jobs gluex 04-16.png|Job History at JLab]] |
*** [http://gryphn.phys.uconn.edu/vofrontend/monitor/frontendStatus.html Recent Job History on the Grid] | *** [http://gryphn.phys.uconn.edu/vofrontend/monitor/frontendStatus.html Recent Job History on the Grid] | ||
** Calibration [[April 9, 2014 Calibration| April 9, 2014]] | ** Calibration [[April 9, 2014 Calibration| April 9, 2014]] | ||
* Photon Beam and Tagger [[BLTWG Meeting 04/14/2014|April 14, 2014]] | * Photon Beam and Tagger [[BLTWG Meeting 04/14/2014|April 14, 2014]] | ||
* Physics [[April 7, 2014, Physics Working Group|April 7, 2014]] | * Physics [[April 7, 2014, Physics Working Group|April 7, 2014]] |
Revision as of 10:46, 16 April 2014
Contents
Meeting Time and Place
The meeting will be on Wednesday April 16, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Collaboration Meeting May 12-14
- Shift to bluejeans
Needed Written Material
Reports from Technical Groups
- Calorimeters:
- Calorimetry April 8, 2014
- BCAL Reconstruction March 6, 2014
- Tracking FADC FPGA April 8, 2014
- CDC
- FDC
- PID
- TOF April 10, 2014
- Start Counter April 3, 2014
- PID Upgrades January 31, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation January 3, 2014 Installation
- Electronics
- Trigger
- Hardware (Level-1) April 9, 2014
- Software (Level-3) February 4, 2014
- DAQ/Monitoring/Controls March 26, 2014
- Offline Software
- Offline April 2, 2014
- Data Challenge Meeting April 11, 2014
- Calibration April 9, 2014
- Photon Beam and Tagger April 14, 2014
- Physics April 7, 2014