Difference between revisions of "Photon Beam Commissioning Discussion Oct 8, 2014"
From GlueXWiki
(Created page with "__TOC__ == Organization == * Time: 4:00 pm EST * Connecting: detailed instructions are here ** H.323 ip address: 199.48.152.152 ** web bro...") |
(→Action Items) |
||
Line 17: | Line 17: | ||
* Screen of beam parameters for Hall D (Hovanes) | * Screen of beam parameters for Hall D (Hovanes) | ||
* Feedback on accelerator on latest ICD draft (Michael, Todd) | * Feedback on accelerator on latest ICD draft (Michael, Todd) | ||
+ | * List of variables from radiation monitors to Pavel (Hovanes and Alexandre) | ||
== Agenda == | == Agenda == |
Revision as of 17:48, 24 September 2014
Organization
- Time: 4:00 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
- Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
- Screen of beam parameters for Hall D (Hovanes)
- Feedback on accelerator on latest ICD draft (Michael, Todd)
- List of variables from radiation monitors to Pavel (Hovanes and Alexandre)
Agenda
- Announcements
- Accelerator and Hall D Interface Document - update
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business
Minutes
Attending: