Difference between revisions of "Photon Beam Commissioning Discussion Oct 8, 2014"
From GlueXWiki
(→Action Items) |
(→Agenda) |
||
Line 21: | Line 21: | ||
== Agenda == | == Agenda == | ||
# Announcements | # Announcements | ||
+ | # ARR3 Recommendations | ||
+ | #* [http://www.jlab.org/Hall-D/halld_secure/reviews/ARR3_Aug2014/ARR_Phase_3_Report_Aug_2014.pdf ARR3 Report] | ||
# Accelerator and Hall D Interface Document - update | # Accelerator and Hall D Interface Document - update | ||
# Update on Photon Commissioning (Alexandre) | # Update on Photon Commissioning (Alexandre) |
Revision as of 15:55, 8 October 2014
Organization
- Time: 4:00 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
- Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
- Screen of beam parameters for Hall D (Hovanes)
- Feedback on accelerator on latest ICD draft (Michael, Todd)
- List of variables from radiation monitors to Pavel (Hovanes and Alexandre)
Agenda
- Announcements
- ARR3 Recommendations
- Accelerator and Hall D Interface Document - update
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business
Minutes
Attending: