Difference between revisions of "GlueX Target Design Review, February 23, 2012"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
==Review Slides==
 
==Review Slides==
  
[https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20February%2022,%202012.pptx Jim's Presentation]
+
[https://halldweb.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20February%2022,%202012.pptx Jim's Presentation]
  
 
==Notes==
 
==Notes==
  
As recorded by Mark:
+
* Target volume of 0.4 l of liquid hydrogen expands to about 1000 l at STP.
 +
* Hall B pumps on scattering chamber with turbo pump all the time.
 +
* Jim added [http://www.lakeshore.com/products/Cryogenic-Temperature-Sensors/Cernox/Models/Pages/Overview.aspx Lakeshore Cernox temperature sensors] at various heights.
 +
** Chris requested that they be removable, to replace defective ones.
 +
* Chris recommends the [http://www.lakeshore.com/products/cryogenic-temperature-monitors/model-218/Pages/Overview.aspx Lakeshore Model 218] 8-channel temperature monitor read-out unit.
 +
* System should be able to liquefy helium-4, taking it down to 3 K.
 +
* Jim will look into adding a relief tube to by-pass normal feed in case of boil off of target liquid.
  
.4 l target
+
Notes recorded by Mark.
1000 l at STP
+
 
+
hall b pumps on scattering chamber with turbo pump all the time
+
 
+
flag on height of fins in condenser, flag raised on gas flow in case of target boiling
+
 
+
lakeshore cernox temperature sensors at various heights, Chris Keith requested
+
steve reports problems with vcr fittings
+
 
+
lakeshore model 218 8-channel read-out montor temperatures
+
 
+
should be able to do helium 4
+
go down to 3 degrees
+
not 2.3 k
+
 
+
 
+
relief tube, not used for cool down and gas feed, by-passes
+

Latest revision as of 23:09, 31 March 2015

Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Chris Keith, Elton Smith, Tim Whitlatch, Elliott Wolin

Review Slides

Jim's Presentation

Notes

  • Target volume of 0.4 l of liquid hydrogen expands to about 1000 l at STP.
  • Hall B pumps on scattering chamber with turbo pump all the time.
  • Jim added Lakeshore Cernox temperature sensors at various heights.
    • Chris requested that they be removable, to replace defective ones.
  • Chris recommends the Lakeshore Model 218 8-channel temperature monitor read-out unit.
  • System should be able to liquefy helium-4, taking it down to 3 K.
  • Jim will look into adding a relief tube to by-pass normal feed in case of boil off of target liquid.

Notes recorded by Mark.