Difference between revisions of "Jul 3, 2012 Calorimetry"
From GlueXWiki
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
|||
(One intermediate revision by one other user not shown) | |||
Line 38: | Line 38: | ||
### Arrival of Steel Frame: [[FCALPhotos]] | ### Arrival of Steel Frame: [[FCALPhotos]] | ||
## [[2011 Hall B FCAL Beam Test]] (John) | ## [[2011 Hall B FCAL Beam Test]] (John) | ||
− | ##[https:// | + | ##[https://halldweb.jlab.org/wiki/images/9/9d/Pmts.pdf FCAL PMT Testing Results] (Kei) |
# BCAL | # BCAL | ||
## Cosmics at Regina | ## Cosmics at Regina | ||
Line 62: | Line 62: | ||
# FCAL | # FCAL | ||
## Construction Status | ## Construction Status | ||
− | ## | + | ##* Arrival of Steel Frame: [[FCALPhotos]] |
+ | ##* Structure machined after welding. Some walls are thin and may require backing for bolts. John is test fitting the structure with Al pieces. | ||
+ | ##* Question: When to ship to JLab? | ||
+ | ##* Vyton is suggested as cushion material at the outside to transmit compression. The material can deteriorate after MRads of irradiation, but should be ok at the outside of the Fcal. | ||
+ | ## PMT Testing | ||
+ | ##* Testing moving smoothly. Board delivery meets assembly schedule. 1100-1500 assembled, tested and burned in. 2% need retesting. Completion expected in August. | ||
+ | ##* Cable labeler (suggested by Fernando) purchased, can import labels from xcel file. Will label the cables that are at IU. | ||
## [[2011 Hall B FCAL Beam Test]] (John) | ## [[2011 Hall B FCAL Beam Test]] (John) | ||
− | ##[https:// | + | ##* Analysis progressing smoothly. Results will be presented when ready. |
+ | ##[https://halldweb.jlab.org/wiki/images/9/9d/Pmts.pdf FCAL PMT Testing Results] (Kei) | ||
+ | ##* Nice summary of pmt testing. Found 58 broken tubes (likely broken before testing). Notice loss of efficiency due to after-pulsing at high rate. They seem to settle down after cycles of testing. | ||
+ | ##* Drifting of gain for a couple of hours before they settle down. | ||
+ | ##* Andrei: Notes that gain estimated from rates needs to correct for accidentals at high rates. | ||
+ | ##* Eugene: Gain on these FEU-84 pmts can change due to charging of the glass. During fabrication the resistivity of the glass needs to be carefully controlled. | ||
+ | ## Discussion of arrangement of pmts onto detector | ||
+ | ##* We decided to use a random arrangement of tubes that exceed specifications. Eugene: tubes with lower specifications can be used at the periphery of acceptance. | ||
# BCAL | # BCAL | ||
## Cosmics at Regina | ## Cosmics at Regina | ||
+ | ##* SiPMs used in cosmic runs. Running for 4 days | ||
+ | ##* Students are being trained with data. | ||
+ | ##* Would like to overhaul DAQ for final stages of running. | ||
## Cosmics run plan (SiPMs) & LEDs at JLab | ## Cosmics run plan (SiPMs) & LEDs at JLab | ||
## Update on [[BCAL Beam Tests 2012]] | ## Update on [[BCAL Beam Tests 2012]] | ||
# USM update | # USM update | ||
## [[Media:USMReport20.pdf|SiPM Update]] (Javiera) | ## [[Media:USMReport20.pdf|SiPM Update]] (Javiera) | ||
+ | ##* Final shipments from Hamamatsu expected this month | ||
+ | ##* About 1500 sensors tested in stage 3 | ||
+ | ##* Fraction of sensors for testing of PDE in stage 2 completed, pending outcome of testing in stage 3 | ||
+ | ##* Yi: How many outliers have been found? One 1, which has a single dead cell at higher bias. | ||
+ | ##* Yi: JLab finds one SiPM that does not meet the uniformity test. What is the distribution at USM? Orlando: PDE uniformity is < 3% | ||
+ | ## Operating point for SiPMs | ||
+ | ##* Serguei: Still investigating optimal operational point. | ||
+ | ## Light guides (Iñaki) | ||
+ | ##* Spare parts for milling machine have not arrived yet. An initial shipment was misplaced and the replacement should arrive this week. | ||
+ | ##* To date guides B-F have been milled. | ||
+ | ##* Remaining guides (A, G-K) should take about a week to machine once the mill is repaired. | ||
+ | ##* Polishing continues. Completed 40%. | ||
# TDR update | # TDR update | ||
## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). |
Latest revision as of 01:50, 1 April 2015
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
[hide]Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Cables
-
Establish cabling for Bcal and Fcal into racksFiles sent to Fernando
-
- Mechanical
-
Check features in Fcal support structure for cable passages and plexiglas support, and space between window frames on glass and plexiglass (Elton, Tim)Appears that the 3 1.5" holes are adequate.
-
- Monitoring
-
Check status of monitoring control boards at JLab (David).
-
- Contracts
-
no-cost schedule extension for Fcal (Elton)Extension has been signed.
-
- SiPMs
-
Evaluate amount of spare SiPM needed to tack onto the present USM orderA full inventory has been conducted. In addition to the 48 units and 1 mini-Bcal, we are short several units to instrument one more module even if all sensors that have been lent our are returned to JLab.
-
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- FCAL
- Construction Status
- Arrival of Steel Frame: FCALPhotos
- 2011 Hall B FCAL Beam Test (John)
- FCAL PMT Testing Results (Kei)
- Construction Status
- BCAL
- Cosmics at Regina
- Cosmics run plan (SiPMs) & LEDs at JLab
- Update on BCAL Beam Tests 2012
- USM update
- SiPM Update (Javiera)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- Any other business
Minutes
Attendees: Elton, Dave, Beni, John, Eugene, Yi (Jlab); Matt, John, Kei (IU), Will, Javiera, Orlando, Hayk, Serguei, Iñaki (USM); Zisis, Andrei (UofR)
- Announcements
- Review of Action Items
- Monitoring
- LED system on Mini BCAL
- FCAL
- Construction Status
- Arrival of Steel Frame: FCALPhotos
- Structure machined after welding. Some walls are thin and may require backing for bolts. John is test fitting the structure with Al pieces.
- Question: When to ship to JLab?
- Vyton is suggested as cushion material at the outside to transmit compression. The material can deteriorate after MRads of irradiation, but should be ok at the outside of the Fcal.
- PMT Testing
- Testing moving smoothly. Board delivery meets assembly schedule. 1100-1500 assembled, tested and burned in. 2% need retesting. Completion expected in August.
- Cable labeler (suggested by Fernando) purchased, can import labels from xcel file. Will label the cables that are at IU.
- 2011 Hall B FCAL Beam Test (John)
- Analysis progressing smoothly. Results will be presented when ready.
- FCAL PMT Testing Results (Kei)
- Nice summary of pmt testing. Found 58 broken tubes (likely broken before testing). Notice loss of efficiency due to after-pulsing at high rate. They seem to settle down after cycles of testing.
- Drifting of gain for a couple of hours before they settle down.
- Andrei: Notes that gain estimated from rates needs to correct for accidentals at high rates.
- Eugene: Gain on these FEU-84 pmts can change due to charging of the glass. During fabrication the resistivity of the glass needs to be carefully controlled.
- Discussion of arrangement of pmts onto detector
- We decided to use a random arrangement of tubes that exceed specifications. Eugene: tubes with lower specifications can be used at the periphery of acceptance.
- Construction Status
- BCAL
- Cosmics at Regina
- SiPMs used in cosmic runs. Running for 4 days
- Students are being trained with data.
- Would like to overhaul DAQ for final stages of running.
- Cosmics run plan (SiPMs) & LEDs at JLab
- Update on BCAL Beam Tests 2012
- Cosmics at Regina
- USM update
- SiPM Update (Javiera)
- Final shipments from Hamamatsu expected this month
- About 1500 sensors tested in stage 3
- Fraction of sensors for testing of PDE in stage 2 completed, pending outcome of testing in stage 3
- Yi: How many outliers have been found? One 1, which has a single dead cell at higher bias.
- Yi: JLab finds one SiPM that does not meet the uniformity test. What is the distribution at USM? Orlando: PDE uniformity is < 3%
- Operating point for SiPMs
- Serguei: Still investigating optimal operational point.
- Light guides (Iñaki)
- Spare parts for milling machine have not arrived yet. An initial shipment was misplaced and the replacement should arrive this week.
- To date guides B-F have been milled.
- Remaining guides (A, G-K) should take about a week to machine once the mill is repaired.
- Polishing continues. Completed 40%.
- SiPM Update (Javiera)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Calibration of Calorimeters
- Simulations/Reconstruction
- Any other business