Difference between revisions of "July 13, 2015"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
:* Trigger path
 
:* Trigger path
  
::: Energy transfer
+
::: - Energy transfer
 +
:::: Fix Nsb to 5
  
::: Hit-bit pattern
+
::: - Hit-bit pattern
  
  

Revision as of 08:55, 13 July 2015

  • Specifications for fadc250 firmware
  • Trigger path
- Energy transfer
Fix Nsb to 5
- Hit-bit pattern


  • FCAL MIPs efficiency
- Track radius
- FCAL energy
  • Adjusting pedestals during the run (pedestal stability check)
  • Implementing trigger scalers (gtp, ssp, )
- add scalers to the data stream
  • Hardware/trigger performance during the beam test
- Reproduce trigger thresholds with recorded data (features with FCAL ST algorithm)
additional checks in read out lists
- Non-uniform occupancies with TOF trigger
- use PlayBack for comprehensive system checks.
High-rate performance checking