Difference between revisions of "Aug 20, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(34 intermediate revisions by 2 users not shown) | |||
Line 16: | Line 16: | ||
# Announcements | # Announcements | ||
+ | ## [http://www.jlab.org/Hall-D/reviews/Bcal_Readout_Jul09 Report from Bcal Readout Review] submitted | ||
# Review of Action Items | # Review of Action Items | ||
# FCAL Update | # FCAL Update | ||
Line 21: | Line 22: | ||
# BCAL Updates | # BCAL Updates | ||
## Fiber QA | ## Fiber QA | ||
− | ### First-article report (Andrei) | + | ##* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1317 First-article report draft] (Zisis) |
+ | ##* [http://www.jlab.org/~semenov/jlab_analysis_report.pdf First-article report checks] (Andrei) | ||
## Lead QA | ## Lead QA | ||
+ | ## [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1318 First-article report draft] (Zisis) | ||
## Fabrication (Zisis) | ## Fabrication (Zisis) | ||
+ | ##* Reporting | ||
+ | ##* Readiness Review ? | ||
# Simulations | # Simulations | ||
# BCAL Readout | # BCAL Readout | ||
+ | ## MOU update? | ||
+ | ## Testing of SiPM arrays (Fernando and Carl) | ||
# Other business | # Other business | ||
=Minutes= | =Minutes= | ||
− | Attendees: | + | Attendees: UofR: Zisis, George, Andrei, Dan; JLab: Tim, John, Beni, Elton; USM: Will, Alam, Manuel, Pedro |
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | ## [http://www.jlab.org/Hall-D/reviews/Bcal_Readout_Jul09 Report from Bcal Readout Review] submitted | ||
+ | # FCAL Update | ||
+ | ## Matt is away, Elton reported on procurement status. PR for fabrication of FCAL modules has been placed and in process. Specification for FEU-84-3 pmts has been written and collecting signatures. | ||
+ | # BCAL Updates | ||
+ | ## BCAL Fabrication | ||
+ | ### 'Big contract' signed (Aug.6). $195,000 until Sept 30, later extended to $220,407. [[Image:Example.jpg]] Reporting form received from Teresa. | ||
+ | ### Ross 'Big Machine' is operational. Big and Small were used and first Al plate delivered a week ago. Slight concave in middle; should be no problem. | ||
+ | ### Press: 'lunar lander' feet on rams are installed. One outermost cylinder has a leak; parts ordered; does not affect build. New, longer press swivel and locking arms will be made and press retrofitted; end pairs will be made and installed. [[Media:LunarLander.jpg]] | ||
+ | ### Fibre sorting table ready and operational; Cu sheet glued with contact cement and tapped at the ends; grounded. | ||
+ | ### Vaseline-free construction room. (Steak dinner courtesy of Tim). | ||
+ | ### Building of the ''Construction Prototype'' commenced (Aug. 18). Two builds, almost 20 layers. [[Image:TasmanianDevil.jpg]] Tower measurements will be done this morning. | ||
+ | ### Quotations for 2nd press are under way; contract will most likely be split between Ross and Hydro Designs. Pistons have been tendered. | ||
+ | ### Danny: Slight crown (6 mils) on current stack. Will continue to monitor. | ||
+ | ## Fiber QA | ||
+ | ##* QA tests on shipment-3 fibres continues. Some irregularities in atten length data: dependence on Kuraray pouch? Data being checked. | ||
+ | ##* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1317 First-article report draft] (Zisis) | ||
+ | ##* [http://www.jlab.org/~semenov/jlab_analysis_report.pdf First-article report checks] (Andrei) | ||
+ | ##* Will: asked about two components to attenuation. Zisis said fits have been made and will be made available. | ||
+ | ## Lead QA | ||
+ | ##* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1318 First-article report draft] (Zisis) | ||
+ | ## Reporting excel sheet has been developed and must be filled out by UofR once per month in advance of project reporting. | ||
+ | ## Readiness Review. Tentative schedule for first week of October. | ||
+ | # Simulations | ||
+ | #* No report | ||
+ | # BCAL Readout | ||
+ | #* Light guide simulations continue and construction of dark box. Report at next week. | ||
+ | # Other business |
Latest revision as of 16:51, 24 February 2017
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09
Contents
Items for followup from previous meeting(s)
- Review calibration procedures
Documents to Review
Tentative Agenda
- Announcements
- Report from Bcal Readout Review submitted
- Review of Action Items
- FCAL Update
- Procurement update (Elton)
- BCAL Updates
- Fiber QA
- First-article report draft (Zisis)
- First-article report checks (Andrei)
- Lead QA
- First-article report draft (Zisis)
- Fabrication (Zisis)
- Reporting
- Readiness Review ?
- Fiber QA
- Simulations
- BCAL Readout
- MOU update?
- Testing of SiPM arrays (Fernando and Carl)
- Other business
Minutes
Attendees: UofR: Zisis, George, Andrei, Dan; JLab: Tim, John, Beni, Elton; USM: Will, Alam, Manuel, Pedro
- Announcements
- Review of Action Items
- Report from Bcal Readout Review submitted
- FCAL Update
- Matt is away, Elton reported on procurement status. PR for fabrication of FCAL modules has been placed and in process. Specification for FEU-84-3 pmts has been written and collecting signatures.
- BCAL Updates
- BCAL Fabrication
- 'Big contract' signed (Aug.6). $195,000 until Sept 30, later extended to $220,407. Reporting form received from Teresa.
- Ross 'Big Machine' is operational. Big and Small were used and first Al plate delivered a week ago. Slight concave in middle; should be no problem.
- Press: 'lunar lander' feet on rams are installed. One outermost cylinder has a leak; parts ordered; does not affect build. New, longer press swivel and locking arms will be made and press retrofitted; end pairs will be made and installed. Media:LunarLander.jpg
- Fibre sorting table ready and operational; Cu sheet glued with contact cement and tapped at the ends; grounded.
- Vaseline-free construction room. (Steak dinner courtesy of Tim).
- Building of the Construction Prototype commenced (Aug. 18). Two builds, almost 20 layers. Tower measurements will be done this morning.
- Quotations for 2nd press are under way; contract will most likely be split between Ross and Hydro Designs. Pistons have been tendered.
- Danny: Slight crown (6 mils) on current stack. Will continue to monitor.
- Fiber QA
- QA tests on shipment-3 fibres continues. Some irregularities in atten length data: dependence on Kuraray pouch? Data being checked.
- First-article report draft (Zisis)
- First-article report checks (Andrei)
- Will: asked about two components to attenuation. Zisis said fits have been made and will be made available.
- Lead QA
- First-article report draft (Zisis)
- Reporting excel sheet has been developed and must be filled out by UofR once per month in advance of project reporting.
- Readiness Review. Tentative schedule for first week of October.
- BCAL Fabrication
- Simulations
- No report
- BCAL Readout
- Light guide simulations continue and construction of dark box. Report at next week.
- Other business