== Magnet == | == Magnet == | ||
− | * [ | + | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2378 Post-construction description: GlueX note 2378] |
* [[Solenoid_References | References: GlueX notes in DocDB]] | * [[Solenoid_References | References: GlueX notes in DocDB]] | ||
* [https://www.jlab.org/Hall-D/solenoid/modifications_2015_sep Modifications of the Cooling Scheme - September 2015] | * [https://www.jlab.org/Hall-D/solenoid/modifications_2015_sep Modifications of the Cooling Scheme - September 2015] |
Revision as of 17:14, 24 February 2017
Contents
[hide]Operations
Wiki Instructions
- Short description and operation guidelines
- Instructions for shift takers
- Programmable Logic Control (PLC)
- PXI Fast DAQ System
Operational Safety Procedures (OSP) : signed documents
- Hall D Solenoid Magnet - Cryogenic Operations: ENG-12-19709-OSP
- Hall D Solenoid Power Supply Test and Maintenance: -13-21781-OSP
- Hall D Solenoid Powered Operations OSP: FEL-13-22021-OSP
Other Procedures and Checklists : signed documents
- Solenoid Cooldown Checklists: D000000402-P003 Rev A
- Solenoid Vacuum System Controls Check Procedure: D000000402P004
- Hall D Solenoid System Hi-Pot Procedure: D000000402P006 RevA
- Solenoid Voltage Tap Check List: D000000402-P010
- Hall D Solenoid Pre Power-Up Checklists: D000000402P007
- Hall D Solenoid Magnet Power Supply Maintenance Turn-on Checklist: D000001611P000 Rev A
- Hall D Solenoid Magnet Power Supply Internal Interlock Checklist: D000001611P001 Rev B
- Ground Fault Detector Rheostat Setting Procedure: D000000402P011
- Hall D Solenoid System Hi-Pot Procedure: D000000402P006 RevA
- Solenoid Quench Detector Tuning Procedure: D000000402P005
- Hall-D Solenoid Commissioning Procedure: D000000402P002
Technical Information
Magnet
- Post-construction description: GlueX note 2378
- References: GlueX notes in DocDB
- Modifications of the Cooling Scheme - September 2015
- Magnetic field
Controls
Operational Experience
- Regular operation
- Anomalies
Old Wiki Page