Difference between revisions of "JEF meeting, July 1, 2022"
From GlueXWiki
(→Agenda) |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | Meeting time and location= | |
*9:30 am EST (JLab time) remote only | *9:30 am EST (JLab time) remote only | ||
*Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142] Passcode: 004965 | *Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142] Passcode: 004965 | ||
Line 5: | Line 5: | ||
=Agenda= | =Agenda= | ||
* Simulations/Analysis | * Simulations/Analysis | ||
− | + | ** [https://halldweb.jlab.org/wiki/images/d/d0/Glue-jefxd-igal-jaegle-24062022.pdf Update on eta to ggpi^0] -- ig | |
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | ||
Line 11: | Line 11: | ||
*** Wrapping crystals (with the DSG) | *** Wrapping crystals (with the DSG) | ||
*** Module fabrication | *** Module fabrication | ||
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 559 (60 + 185 + 166 + 80 + 68) |
− | *** | + | *** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) |
− | + | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total | + | ** Fabricated modules: <span style="color:#FF0000"> Total 746 </span> |
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All 561 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All 561 SICCAS] | ||
− | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf | + | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 185 CRYTUR], Remaining: 442 |
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126] | ||
− | + | **Students reports | |
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/7_1_22/fun_time.png Fun time] | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Latest revision as of 09:27, 1 July 2022
Meeting time and location=
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Update on eta to ggpi^0 -- ig
- Preparation of parts for FCAL2 modules -- Sasha
- Preparation of parts[1][2][3]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Module fabrication
- Wrapped CRYTUR crystals: 559 (60 + 185 + 166 + 80 + 68)
- All currently available (consider to borrow some spares from NPS)
- Preparation of parts[1][2][3]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 746
- All 561 SICCAS
- 185 CRYTUR, Remaining: 442
- Clean room EEL126
- Students reports
- Fun time
- Light Monitoring System -- Arshak