Difference between revisions of "October 05, 2022 FCAL Insert Installation Meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
== Agenda == | == Agenda == | ||
− | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/ | + | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/September_21,_2022_FCAL_Insert_Installation_Meeting |
* Discuss Lead Glass and crystal module removal/install] - Sasha | * Discuss Lead Glass and crystal module removal/install] - Sasha | ||
* Use of platform upstream of detector - Stephanie/Tim | * Use of platform upstream of detector - Stephanie/Tim | ||
Line 12: | Line 12: | ||
** New Cables | ** New Cables | ||
* Cable quotes 0 Chris S. | * Cable quotes 0 Chris S. | ||
+ | * Existing structure can support 2500lbs | ||
* Monitoring system discussion directly after | * Monitoring system discussion directly after | ||
* Assembly in ESB | * Assembly in ESB | ||
Line 21: | Line 22: | ||
[[image:Work_platform_top.png|thumb]] | [[image:Work_platform_top.png|thumb]] | ||
[[image:Work_platform_iso.png|thumb]] | [[image:Work_platform_iso.png|thumb]] | ||
− | [[image:Work_platform_bird|thumb]] | + | [[image:Work_platform_bird.png|thumb]] |
== Minutes == | == Minutes == | ||
+ | * Discussed lead glass module removal/install | ||
+ | ** Lead glass blocks will be installed as they are now with alternating SS vertical and then horizontal | ||
+ | ** Refurbishing existing module bases is about 1 hour for Malte and Mark, but Chris S. also has to do very delicate work also | ||
+ | ** Students may help base repairs but ES&H input would be needed | ||
+ | ** Since there is no time to design, test and fabricate new bases for the existing modules, we will stick to repairing existing bases | ||
+ | ** The worst bases should be removed in March before taking apart the detector so the repairs can be started | ||
+ | ** More detail needed on existing module refurbish plan | ||
+ | ** Mark D. has database for existing module and will come up with an initial plan for sorting | ||
+ | ** Existing cables that may be used need to be relabeled and put in database | ||
+ | ** Eugene expressed that we should work with the mini FCAL to develop the removal/refurbish plan | ||
+ | |||
+ | * Cable discussions | ||
+ | ** Fernando expressed that in the tight area, LV cables should not be ribbon cables - 1 cable for each base should be used | ||
+ | ** Revisited signal cable plan to come from downstream wall through patch panel - Mark D. not at previous meeting - seems ok | ||
+ | ** Six patch panels in all for all new cables - need to start designing this for dark room and reinforcements needed | ||
+ | ** Existing I-beam over dark room should handle additional cable weight | ||
+ | ** Need to look at cable routing under platform and come up with a layout | ||
+ | ** Sasha needs to come up with a cable mapping plan to help reach decisions on using existing cables or removing all | ||
+ | ** Chris S. will ship out 1200 signal cables to get terminated | ||
+ | ** Chris S. to get quote on additional 400 signal cables | ||
+ | ** Chris already request quote for 1600 new thin (RG174) signal cables to go from patch panel to detectors | ||
+ | * Looked at using the existing BCAL install platform on the upstream side of the FCAL. | ||
+ | ** We should probably use this regardless of decision to remove cables from crates | ||
+ | ** Can we use scaffolding on the temporary platform? | ||
+ | * Discussed insulation vacuum vs. standard - standard foam board ok since delta T is small | ||
+ | |||
+ | * Discussed monitoring panel design for the crystals in a separate meeting | ||
+ | ** Arshak showed his testing and baseline design | ||
+ | *** Optical fibers coming in on all 4 outer edges (120 fibers for now) | ||
+ | *** 1/2" acrylic sheet in 2 pieces | ||
+ | ** Discussed how to route fibers | ||
+ | *** through holes in FCAL2 step frames - bushings needed | ||
+ | *** route over glass module monitoring panel | ||
+ | *** maybe have fiber connections at upstream surface and install with rohacell backbone and tungsten absorber as an assembly | ||
+ | *** is there 90° connectors for fibers or generous bend radius needed? | ||
+ | ** Discussed supporting outer edges of panel to rohacell for stability | ||
== Action Items == | == Action Items == | ||
+ | * Send out 1200 signal cables to get terminated - Chris S. | ||
+ | * Start looking at how to use the existing database for lead glass handling - Mark D | ||
+ | * Update baseline schedule with additional items discussed - Scot | ||
+ | * Come up with a written cable mapping plan - Sasha | ||
+ | * Update 3D model for patch panels - Stephanie | ||
+ | * Develop cable routing plan under platform - Tim/Scot/Stephanie | ||
+ | * Check on use of scaffolding on the platform - Scot | ||
+ | * Continue with monitoring panel design - Arshak, Stephanie, Tim, Keith |
Latest revision as of 14:51, 11 October 2022
Meeting Time and Place
Wednesday October 05, 2022 10am At Jefferson Lab, Hall D Counting House and on Teams
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/September_21,_2022_FCAL_Insert_Installation_Meeting
- Discuss Lead Glass and crystal module removal/install] - Sasha
- Use of platform upstream of detector - Stephanie/Tim
- Discuss cable mapping - Sasha
- Existing cables
- New Cables
- Cable quotes 0 Chris S.
- Existing structure can support 2500lbs
- Monitoring system discussion directly after
- Assembly in ESB
- Media:FCAL2_strawman_schedule.pdf
Minutes
- Discussed lead glass module removal/install
- Lead glass blocks will be installed as they are now with alternating SS vertical and then horizontal
- Refurbishing existing module bases is about 1 hour for Malte and Mark, but Chris S. also has to do very delicate work also
- Students may help base repairs but ES&H input would be needed
- Since there is no time to design, test and fabricate new bases for the existing modules, we will stick to repairing existing bases
- The worst bases should be removed in March before taking apart the detector so the repairs can be started
- More detail needed on existing module refurbish plan
- Mark D. has database for existing module and will come up with an initial plan for sorting
- Existing cables that may be used need to be relabeled and put in database
- Eugene expressed that we should work with the mini FCAL to develop the removal/refurbish plan
- Cable discussions
- Fernando expressed that in the tight area, LV cables should not be ribbon cables - 1 cable for each base should be used
- Revisited signal cable plan to come from downstream wall through patch panel - Mark D. not at previous meeting - seems ok
- Six patch panels in all for all new cables - need to start designing this for dark room and reinforcements needed
- Existing I-beam over dark room should handle additional cable weight
- Need to look at cable routing under platform and come up with a layout
- Sasha needs to come up with a cable mapping plan to help reach decisions on using existing cables or removing all
- Chris S. will ship out 1200 signal cables to get terminated
- Chris S. to get quote on additional 400 signal cables
- Chris already request quote for 1600 new thin (RG174) signal cables to go from patch panel to detectors
- Looked at using the existing BCAL install platform on the upstream side of the FCAL.
- We should probably use this regardless of decision to remove cables from crates
- Can we use scaffolding on the temporary platform?
- Discussed insulation vacuum vs. standard - standard foam board ok since delta T is small
- Discussed monitoring panel design for the crystals in a separate meeting
- Arshak showed his testing and baseline design
- Optical fibers coming in on all 4 outer edges (120 fibers for now)
- 1/2" acrylic sheet in 2 pieces
- Discussed how to route fibers
- through holes in FCAL2 step frames - bushings needed
- route over glass module monitoring panel
- maybe have fiber connections at upstream surface and install with rohacell backbone and tungsten absorber as an assembly
- is there 90° connectors for fibers or generous bend radius needed?
- Discussed supporting outer edges of panel to rohacell for stability
- Arshak showed his testing and baseline design
Action Items
- Send out 1200 signal cables to get terminated - Chris S.
- Start looking at how to use the existing database for lead glass handling - Mark D
- Update baseline schedule with additional items discussed - Scot
- Come up with a written cable mapping plan - Sasha
- Update 3D model for patch panels - Stephanie
- Develop cable routing plan under platform - Tim/Scot/Stephanie
- Check on use of scaffolding on the platform - Scot
- Continue with monitoring panel design - Arshak, Stephanie, Tim, Keith