Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"
From GlueXWiki
(→Monday March 6) |
(→Wednesday March 8) |
||
(27 intermediate revisions by 3 users not shown) | |||
Line 9: | Line 9: | ||
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count] | [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count] | ||
+ | = Wednesday March 8 = | ||
+ | === Past 24 hours === | ||
+ | * More HI running, one run completed with tin foil, 25% through the program. | ||
+ | * Continued work on BCAL prototype | ||
+ | * Restoration of beam (to all 4 halls) - production | ||
+ | *loss of beam after midnight - restored | ||
+ | * Opted to do a harp scan as production resumed. (Been a while) | ||
+ | |||
+ | === Shift Reports === | ||
+ | [https://logbooks.jlab.org/entry/4144271 Early Riser] | ||
+ | [https://logbooks.jlab.org/entry/4144422 Day] | ||
+ | [https://logbooks.jlab.org/entry/4144502 Swing] | ||
+ | [https://logbooks.jlab.org/entry/4144733 Owl] | ||
+ | === Reports === | ||
+ | * High-I running [https://logbooks.jlab.org/entry/4144319] | ||
+ | *[https://logbooks.jlab.org/entry/4144410 Scaler rates during High-Intensity testing] | ||
+ | *[https://logbooks.jlab.org/entry/4144385 CDC HVB with W, Sn+W foils] (Naomi) | ||
+ | * [https://logbooks.jlab.org/entry/4144727 first look at BCAL prototype results] (Sasha) | ||
+ | * [https://logbooks.jlab.org/entry/4144848 Harp Scan] | ||
+ | |||
+ | === Issues === | ||
+ | * [https://logbooks.jlab.org/entry/4144393 AC at Y-corr limit during HI testing] (Hovanes) | ||
+ | * [https://logbooks.jlab.org/entry/4144409 HV crate again alarming] Diagnosis: [https://logbooks.jlab.org/entry/4144568] | ||
+ | * TPOL alarms | ||
+ | |||
+ | === Plans === | ||
+ | * High Current Testing- IP | ||
+ | *Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **2 runs PERP (0/90) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
+ | |||
+ | = Tuesday March 7 = | ||
+ | === Past 24 hours === | ||
+ | *Begin of high intensity tests | ||
+ | *Maintenance day part 5 | ||
+ | *Calorimeter Installation | ||
+ | *Various hall accesses and repairs | ||
+ | *Huge problems in late swing early owl with TAGH,Magnet | ||
+ | *overnight production | ||
+ | |||
+ | === Shift Reports === | ||
+ | [https://logbooks.jlab.org/entry/4143812 Early Riser] | ||
+ | [https://logbooks.jlab.org/entry/4143891 Day] | ||
+ | [https://logbooks.jlab.org/entry/4144010 Swing] | ||
+ | [https://logbooks.jlab.org/entry/4144172 Owl] | ||
+ | === Reports === | ||
+ | * before Monday meeting: [https://logbooks.jlab.org/entry/4143858 TAGH power cycled] (Lubomir) | ||
+ | * [https://logbooks.jlab.org/entry/4143874 FCAL bases changed] (Mark D) | ||
+ | * [https://logbooks.jlab.org/entry/4144075 FCAL pulser tests] (Malte) | ||
+ | * [https://logbooks.jlab.org/entry/4143982 TOF performance in Winter] (Beni) | ||
+ | * [https://logbooks.jlab.org/entry/4143877 AC gains set] | ||
+ | * [https://logbooks.jlab.org/entry/4144345 TAGH gains at 900nA] | ||
+ | * [https://logbooks.jlab.org/entry/4144346 BCAL prototype installed] [https://logbooks.jlab.org/entry/4144356] (Sasha) [https://halldweb.jlab.org/wiki/index.php/Mini_BCAL_in_Hall-D miniBCAL in Hall-D] (ksuresh) | ||
+ | * [https://logbooks.jlab.org/entry/4144355 U-1-7 ADC] (Sasha) | ||
+ | * [https://logbooks.jlab.org/entry/4144356 power supplies BCAL prototype] | ||
+ | |||
+ | === Issues === | ||
+ | * [https://logbooks.jlab.org/entry/4144340 AC Vbias tripped yesterday afternoon] | ||
+ | * [https://logbooks.jlab.org/entry/4143969 Tagger NMR did not lock initially until reboot] | ||
+ | * [https://logbooks.jlab.org/entry/4144204 Magnet was not properly restarted, MCC] This is believed by RC and Owl SL to be correlated with the HALO and TAGH voltages tripping and TAGH readouts showing 0 and requiring hard IOC reboot. Possibly poorly positioned beam. | ||
+ | * [https://logbooks.jlab.org/entry/4144200 Crates not communicating back] (Hovanes) | ||
+ | * [https://logbooks.jlab.org/files/styles/plentybig/public/2023/03/4144010/Screenshot%20from%202023-03-06%2021-21-02.png?itok=pcpNQuIt HALO Alarm] | ||
+ | |||
+ | === Alarms During Maintenance === | ||
+ | * [https://logbooks.jlab.org/entry/4143976 Tagger Magnet Alarm, cleared] | ||
+ | * [https://logbooks.jlab.org/entry/4143905 TPOL] | ||
+ | * [https://logbooks.jlab.org/entry/4144008 DIRC] | ||
+ | * [https://logbooks.jlab.org/entry/4143987 CDC p_diff] | ||
+ | |||
+ | === Plans === | ||
+ | * High Current Testing- IP | ||
+ | * Anticipated MCC downtime: Hall Accesses? "Part 6" | ||
+ | *Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **2 runs PERP (0/90) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
+ | * almost time for a harp scan? | ||
= Monday March 6 = | = Monday March 6 = | ||
Line 20: | Line 102: | ||
[https://logbooks.jlab.org/entry/4143741 Owl] | [https://logbooks.jlab.org/entry/4143741 Owl] | ||
=== Reports === | === Reports === | ||
− | + | [https://logbooks.jlab.org/entry/4143857 TAC run report](Sasha) | |
=== Issues === | === Issues === | ||
*FCAL Lockups as usual | *FCAL Lockups as usual | ||
Line 26: | Line 108: | ||
=== Plans === | === Plans === | ||
− | * Monday: High Intensity Running | + | * Monday: High Intensity Running - IP |
− | * Cycle TAGH crate(need RadCon approval) | + | * Cycle TAGH crate(need RadCon approval) - done |
*Production (300 nA, 2h runs) with cycle: | *Production (300 nA, 2h runs) with cycle: | ||
**2 runs PARA (0/90) | **2 runs PARA (0/90) | ||
Line 49: | Line 131: | ||
=== Reports === | === Reports === | ||
− | * [https://logbooks.jlab.org/entry/4143206 Setting up TAC run] [https://logbooks.jlab.org/entry/4143203 MCC version] | + | * [https://logbooks.jlab.org/entry/4143206 Setting up TAC run] [https://logbooks.jlab.org/entry/4143203 MCC version][https://logbooks.jlab.org/entry/4143857] -- Sasha |
* [https://logbooks.jlab.org/entry/4143091] [https://logbooks.jlab.org/entry/4143046] two FCAL bases lock up | * [https://logbooks.jlab.org/entry/4143091] [https://logbooks.jlab.org/entry/4143046] two FCAL bases lock up | ||
Latest revision as of 03:06, 8 March 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Wednesday March 8
Past 24 hours
- More HI running, one run completed with tin foil, 25% through the program.
- Continued work on BCAL prototype
- Restoration of beam (to all 4 halls) - production
- loss of beam after midnight - restored
- Opted to do a harp scan as production resumed. (Been a while)
Shift Reports
Reports
- High-I running [1]
- Scaler rates during High-Intensity testing
- CDC HVB with W, Sn+W foils (Naomi)
- first look at BCAL prototype results (Sasha)
- Harp Scan
Issues
- AC at Y-corr limit during HI testing (Hovanes)
- HV crate again alarming Diagnosis: [2]
- TPOL alarms
Plans
- High Current Testing- IP
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Tuesday March 7
Past 24 hours
- Begin of high intensity tests
- Maintenance day part 5
- Calorimeter Installation
- Various hall accesses and repairs
- Huge problems in late swing early owl with TAGH,Magnet
- overnight production
Shift Reports
Reports
- before Monday meeting: TAGH power cycled (Lubomir)
- FCAL bases changed (Mark D)
- FCAL pulser tests (Malte)
- TOF performance in Winter (Beni)
- AC gains set
- TAGH gains at 900nA
- BCAL prototype installed [3] (Sasha) miniBCAL in Hall-D (ksuresh)
- U-1-7 ADC (Sasha)
- power supplies BCAL prototype
Issues
- AC Vbias tripped yesterday afternoon
- Tagger NMR did not lock initially until reboot
- Magnet was not properly restarted, MCC This is believed by RC and Owl SL to be correlated with the HALO and TAGH voltages tripping and TAGH readouts showing 0 and requiring hard IOC reboot. Possibly poorly positioned beam.
- Crates not communicating back (Hovanes)
- HALO Alarm
Alarms During Maintenance
Plans
- High Current Testing- IP
- Anticipated MCC downtime: Hall Accesses? "Part 6"
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
- almost time for a harp scan?
Monday March 6
Past 24 hours
- Production for most of day
- RF Cavity trip (early swing)
Shift Reports
Reports
TAC run report(Sasha)
Issues
- FCAL Lockups as usual
- DIRC ROC alarm self healed when restarting DAQ (I happened to be in counting room)
Plans
- Monday: High Intensity Running - IP
- Cycle TAGH crate(need RadCon approval) - done
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Sunday March 5
Past 24 hours
- Downtime part 4
- TAC prep and run
- Resume production
Shift Reports
Reports
- Setting up TAC run MCC version[4] -- Sasha
- [5] [6] two FCAL bases lock up
Issues
- [7] PS - halldxps5 reboot (Hovanes) - done in Swing
- FCAL base needs changing (Mark D - not urgent, probably opportunistic)
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Saturday March 4
Past 24 hours
- Justin went into Hall to fix DIRC comm issue, looks good
- Production running starting with AMO then on to the cycle. Offering catch-up of 80M events 45/135 PERP with new AMO reference hopefully rescaling Coherent Peak
Shift Reports
Reports
- TagM Column Readout (Beni)
- FCAL Lockup
Issues
- DAQ had failure with some ROCs, needed work from Sasha and Sergey, completed by Sasha late Swing
- Coherent Edge (Phoebe)
- TAGH Crate [8] [9]
Plans
- TAC Run (Sasha/Alexandre)
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Friday March 3
Past 24 hours
- RadCon surveyed the detector prototype and it has been removed
- ACC downtimes: 2L25 solenoid, BLM trips, 1L09 HV
- Harp scan in Swing. The fits are "OK" though there have probably been better
- Richard Jones does Normalization run using AMO with only Row 4 of TAGM to further the study.
- OWL: resume production
Shift Reports
Reports
- 100V 500V ISEG locations(Mark)
- RF TDC cable reconnected (Lubomir)
- CCAL crate added to DAQ config (Sasha)
- Special running part 2 (Richard)
Issues
- Administrative: Error Connecting to VNC Suite - port 33 somewhat got killed. use 5901 or 5902 - part of it is my fault, due to remembering the wrong password...
- DIRC alarms becoming more frequent [10] [11] [12] [13]
- One FCAL lockup reported OWL shift
Plans
- TAC Run (Sasha/Alexandre)
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday March 2
Past 24 hours
- MCC "Maintenance Day"
- TAGM diagnosis, row checks
- Production runs (Late MCC Swing and Owl)
- After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains
Shift Reports
Reports
- second atmospheric pressure sensor added (Hovanes)
- 5x5 Sciglass Detector Prototype (Sasha)
- rho yields addressing TagM Issue (Alex)
- FDC wire discrepancy update (Lubomir)
- CDC AI HV control enabled (David L)
- Beam time structure(Hovanes)
- TAGM efficiency checks (Justin)
- Special TAGM Row 4 Runs (Richard)
Issues
- Coherent peak
- Tagger magnet tripped off (MCC - Daniel)
- RF TDC
- MCC reports some phase shifts for beam @ 5th pass (all halls)
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
- Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance as RadCon will have to come when beam is down for a sustained period time.
- Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)