Difference between revisions of "Coil Test Weekly Meeting 21-Jan-2011"
From GlueXWiki
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
* Update on installation progress | * Update on installation progress | ||
− | * | + | * Coil taps and Dataforth system - Elliott |
+ | ** voltage attenuators? | ||
+ | ** input impedance and overcurrent protection resistor size | ||
* What to do about jumpers in connector box - Jonathan, Elliott | * What to do about jumpers in connector box - Jonathan, Elliott | ||
+ | * Danfysik offset - Mark, Cody | ||
* [[For_the_second_coil|To-do list]] for the next coil | * [[For_the_second_coil|To-do list]] for the next coil | ||
* Coil 3 strategy | * Coil 3 strategy |
Latest revision as of 18:48, 20 January 2011
Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 21-Jan-2011 9:30 am ARC 428
Agenda
- Update on installation progress
- Coil taps and Dataforth system - Elliott
- voltage attenuators?
- input impedance and overcurrent protection resistor size
- What to do about jumpers in connector box - Jonathan, Elliott
- Danfysik offset - Mark, Cody
- To-do list for the next coil
- Coil 3 strategy
- Coil 2 repair status
- Status of abstract submission and paper - George
- Preparing for moving into the hall