Difference between revisions of "2013-02-06"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday February 6, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == ...") |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(9 intermediate revisions by 3 users not shown) | |||
Line 26: | Line 26: | ||
=== Announcements === | === Announcements === | ||
# [[GlueX-Collaboration-Feb-2013|Collaboration Meeting]], February 21-23 | # [[GlueX-Collaboration-Feb-2013|Collaboration Meeting]], February 21-23 | ||
− | |||
=== MOU and Contract Status === | === MOU and Contract Status === | ||
Line 39: | Line 38: | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
* Calorimeters | * Calorimeters | ||
− | ** Calorimetry [[Jan | + | ** Calorimetry [[Jan 29, 2013 Calorimetry|January 29, 2013]] |
− | *** FCAL [[https:// | + | *** FCAL - 744 Modules Complete [[https://halldweb.jlab.org/wiki/index.php/File:20130206_101625_resized.jpg]] |
− | ** BCAL Readout [[ | + | ** BCAL Readout [[Feb 5,2013 Readout|February 5, 2013]] |
* Tracking [[January 16, 2013 Tracking CDC/FDC| January 16, 2013]] | * Tracking [[January 16, 2013 Tracking CDC/FDC| January 16, 2013]] | ||
− | ** CDC | + | ** CDC [[Image:cdcgasbag.jpg|thumb|x120px]] |
** FDC | ** FDC | ||
* PID | * PID | ||
− | ** TOF [[GlueX TOF Meeting, | + | ** TOF [[GlueX TOF Meeting, January 31, 2013|January 31, 2013]] |
− | ** Start Counter [[GlueX Start Counter Meeting, | + | ** Start Counter [[GlueX Start Counter Meeting, January 24, 2013#Minutes|January 24, 2013]] |
− | ** PID Upgrades [[November 2, 2012 PID Upgrade|November 2, 2012]] | + | ** PID Upgrades [[November 2, 2012 PID Upgrade|November 2, 2012]] (meeting on Friday) |
* Engineering | * Engineering | ||
** Magnet | ** Magnet | ||
** Target | ** Target | ||
** Engineering Activities | ** Engineering Activities | ||
− | ** Installation [[October 29, 2012 Installation|November 12, 2012 Installation]] | + | ** Installation [[October 29, 2012 Installation|November 12, 2012 Installation]] (meeting next week). |
* Electronics | * Electronics | ||
** Technical Design Report | ** Technical Design Report | ||
− | * Trigger [[OWG Meeting | + | * Trigger [[OWG Meeting 30-Jan-2013 |January 30, 2013]] |
− | * DAQ/Monitoring/Controls [[OWG Meeting | + | * DAQ/Monitoring/Controls [[OWG Meeting 30-Jan-2013 |January 30, 2013]] |
* Offline | * Offline | ||
− | ** Software Meeting [[GlueX Offline Meeting, January | + | ** Software Meeting [[GlueX Offline Meeting, January 23, 2013#Minutes|January 23, 2013]] |
− | * Photon Beam and Tagger [[BLTWG Meeting | + | * Photon Beam and Tagger [[BLTWG Meeting 02/04/2013|February 4, 2013]] |
− | * Physics [[January | + | * Physics [[January 28, 2013, Physics Working Group|January 28, 2013]] |
=== AOT === | === AOT === |
Latest revision as of 06:10, 1 April 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday February 6, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Collaboration Meeting, February 21-23
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
Reports from Technical Groups
- Calorimeters
- Calorimetry January 29, 2013
- FCAL - 744 Modules Complete [[1]]
- BCAL Readout February 5, 2013
- Calorimetry January 29, 2013
- Tracking January 16, 2013
- CDC
- FDC
- PID
- TOF January 31, 2013
- Start Counter January 24, 2013
- PID Upgrades November 2, 2012 (meeting on Friday)
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation November 12, 2012 Installation (meeting next week).
- Electronics
- Technical Design Report
- Trigger January 30, 2013
- DAQ/Monitoring/Controls January 30, 2013
- Offline
- Software Meeting January 23, 2013
- Photon Beam and Tagger February 4, 2013
- Physics January 28, 2013