Difference between revisions of "2014-08-20"
From GlueXWiki
(→Reports from Technical Groups) |
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki") |
||
(24 intermediate revisions by 5 users not shown) | |||
Line 21: | Line 21: | ||
* [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] October 2-4, 2014 | * [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] October 2-4, 2014 | ||
* Solenoid | * Solenoid | ||
+ | |||
+ | === Running in Fall 2014 === | ||
+ | * Coordination | ||
+ | ** Run Coordinator - Alexandre Deur | ||
+ | ** Physics Division Liaison - Yi Qiang | ||
+ | ** Shift Scheduler - Reinhard Schumacher | ||
+ | ** Analysis Coordinator - Volker Crede or designate from Physics group | ||
+ | * Plans | ||
+ | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan] | ||
+ | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan] | ||
+ | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning] | ||
+ | ** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below) | ||
+ | * Manpower | ||
+ | ** Shift Schedule site available next week. | ||
+ | ** We need to schedule early October to early December, actual run is 3 weeks. | ||
=== Ongoing Activities === | === Ongoing Activities === | ||
* Technical Construction Report | * Technical Construction Report | ||
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ||
− | **[https:// | + | **[https://halldweb.jlab.org/wiki/index.php/StatusTable TCR Status] |
− | * Solenoid Current Studies | + | * [[Solenoid Current Studies]] |
− | + | ||
− | + | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
Line 36: | Line 49: | ||
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-08-07| August 7, 2014]] | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-08-07| August 7, 2014]] | ||
* Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]] | * Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]] | ||
− | ** CDC | + | ** CDC [https://logbooks.jlab.org/entry/3291616 Curved Tracks] 650A Solenoid Current |
− | ** FDC | + | ** FDC [http://www.jlab.org/Hall-D/detector/fdc/DAQ/run126_ext1_ev2673_2.pdf scattering event], [http://www.jlab.org/Hall-D/detector/fdc/DAQ/run127_ext2_ev3355_2.pdf horizontal shower event] |
− | ** FADC FPGA [[ | + | ** FADC FPGA [[FADC_Data_Format_August_19,_2014 |August 19, 2014]] |
* PID | * PID | ||
** TOF [[GlueX TOF Meeting, August 12, 2014|August 12, 2014]] | ** TOF [[GlueX TOF Meeting, August 12, 2014|August 12, 2014]] |
Latest revision as of 21:02, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday August 20, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Readiness Review August 26-28, 2014
- Collaboration Meeting October 2-4, 2014
- Solenoid
Running in Fall 2014
- Coordination
- Run Coordinator - Alexandre Deur
- Physics Division Liaison - Yi Qiang
- Shift Scheduler - Reinhard Schumacher
- Analysis Coordinator - Volker Crede or designate from Physics group
- Plans
- Manpower
- Shift Schedule site available next week.
- We need to schedule early October to early December, actual run is 3 weeks.
Ongoing Activities
- Technical Construction Report
- Solenoid Current Studies
Reports from Technical Groups
- Calorimeters: August 14, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction August 7, 2014
- Tracking Joint FDC/CDC Meeting August 14, 2014
- CDC Curved Tracks 650A Solenoid Current
- FDC scattering event, horizontal shower event
- FADC FPGA August 19, 2014
- PID
- TOF August 12, 2014
- [ https://logbooks.jlab.org/entry/3289258 Logbook entry of TOF cosmic trigger]
- Start Counter July 24, 2014
- PID Upgrades August 15, 2014
- TOF August 12, 2014
- DAQ/Monitoring/Controls July 30, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) July 30, 2014
- Software (Level-3) June 10, 2014
- Offline Software
- Offline August 6, 2014
- Calibration August 13, 2014
- Photon Beam and Tagger August 18, 2014
- Physics August 11, 2014