Difference between revisions of "October 22, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 17: | Line 17: | ||
# Announcements | # Announcements | ||
− | #* [https://www.jlab.org/exp_prog/experiment_schedule/2018/20181019_sch.pdf Updated schedule] from JLab management, full energy running | + | #* [https://www.jlab.org/exp_prog/experiment_schedule/2018/20181019_sch.pdf Updated schedule] from JLab management, full energy running throughl 11/26 |
#* CompCal is priority for Fall, and will likely be installed during shorter downtimes leading up to Thanksgiving | #* CompCal is priority for Fall, and will likely be installed during shorter downtimes leading up to Thanksgiving | ||
# Optical box | # Optical box | ||
#* Fabrication status update (Ernie and Jason) | #* Fabrication status update (Ernie and Jason) | ||
#** Box window flange modification at Lesker (Ernie/Tim) | #** Box window flange modification at Lesker (Ernie/Tim) | ||
+ | #*** Box received by Lesker last Tuesday, 11/16 | ||
#** Dark box enclosure: fabrication and testing (Jason) | #** Dark box enclosure: fabrication and testing (Jason) | ||
#** Quartz window (with modified flange) (Ernie) | #** Quartz window (with modified flange) (Ernie) | ||
Line 28: | Line 29: | ||
#* Testing in EEL 226 | #* Testing in EEL 226 | ||
#** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason] | #** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason] | ||
− | #** Cabling tests and plans for dark box tests | + | #** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Oct_22_2018.pdf Cabling tests and plans for dark box tests] |
# DAQ integration | # DAQ integration | ||
# Slow controls | # Slow controls | ||
# Software/simulations | # Software/simulations | ||
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie) | #* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie) | ||
− | #* LED generator (Yunjie) | + | #* LED generator ([https://halldweb.jlab.org/wiki/images/c/c2/LED_102218.pdf Yunjie]) |
#* Time-based studies (Maria [https://gluexdirc.mit.edu/sim-update-1 1] [https://gluexdirc.mit.edu/dirc-time-imaging-reco 2] [https://gluexdirc.mit.edu/dirc-time-imaging-reco-2-png 3]) | #* Time-based studies (Maria [https://gluexdirc.mit.edu/sim-update-1 1] [https://gluexdirc.mit.edu/dirc-time-imaging-reco 2] [https://gluexdirc.mit.edu/dirc-time-imaging-reco-2-png 3]) | ||
#* Alignment updates (Cris) | #* Alignment updates (Cris) |
Latest revision as of 13:08, 22 October 2018
Meeting Information
GlueX DIRC Meeting
Monday October 22, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Updated schedule from JLab management, full energy running throughl 11/26
- CompCal is priority for Fall, and will likely be installed during shorter downtimes leading up to Thanksgiving
- Optical box
- Fabrication status update (Ernie and Jason)
- Box window flange modification at Lesker (Ernie/Tim)
- Box received by Lesker last Tuesday, 11/16
- Dark box enclosure: fabrication and testing (Jason)
- Quartz window (with modified flange) (Ernie)
- Box window flange modification at Lesker (Ernie/Tim)
- Testing in ESB
- Mirror box laser alignment (Bill)
- Testing in EEL 226
- Fabrication status update (Ernie and Jason)
- DAQ integration
- Slow controls
- Software/simulations
- Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
- AOB