==Tuesday, Dec 4 at 8:45 == | ==Tuesday, Dec 4 at 8:45 == | ||
− | + | # Comp Cal Status | |
− | # Target installation Plan | + | #* LED signal can be seen by all but one channel . |
+ | #* Empty target run overnight, snake pattern voltage check (now is on the third row) | ||
+ | #* Sasha's log entry: https://logbooks.jlab.org/entry/3634609 | ||
+ | # Target installation Plan for next Monday: 70 hours (Planed by Chris, modified by Tim and Alexandre) | ||
+ | #* Hall opens at 8am Monday; | ||
+ | #* With Radcon support, Hall D techs remove beamline and retract target cryostat; | ||
+ | #* Hall D techs uncable and remove start counter from cryostat; | ||
+ | #* Target Group secures H2 gas, inerts the target piping, and bleeds vacuum chamber to atmospheric pressure; | ||
+ | #* With Radcon support, Target Group removes foam portion of cryostat; | ||
+ | #* With Radcon support, TG removes superinsulation around target cell; | ||
+ | #* With Radcon support, TG removes LH2 target cell; | ||
+ | #* TG mounts beryllium sample in place of LH2 cell; | ||
+ | #* Location of Be sample fiducialized against outside markers on cryostat; | ||
+ | #* Foam portion of cryostat is put back in place, vacuum pumps on; | ||
+ | #* Start counter put back in place, cables attached; | ||
+ | #* Target inserted into solenoid | ||
+ | #* Survey adjusts position in solenoid | ||
+ | #* Beamline assembled and pumpe | ||
# TAGM trigger issue (Richard): https://logbooks.jlab.org/entry/3633836 | # TAGM trigger issue (Richard): https://logbooks.jlab.org/entry/3633836 | ||
+ | # TAGH HV/signal cabling check (requested by Sean). | ||
+ | #* A hardware expert is required to go with Stuart. | ||
+ | # MCC promised to looked into the low current monitor at 5C11B | ||
+ | |||
+ | ==Tuesday, Dec 4 at 8:45 == | ||
+ | # Day and swing: | ||
+ | #* Snake pattern voltage scan (50% completed). | ||
+ | #* Hall access to check the solenoid He level probe. (Bobby and Mark) | ||
+ | # Overnight: 20nA on 1x10^-4 radiator, LH2 production data, lost few hours of data taking due to issues: | ||
+ | #* Issue 1: AC gain changed | ||
+ | #* Issue 2: 1x10^-4 radiator (ion chamber was not calibrated). | ||
+ | #* Problem resolved around 4am, MCC currently calibrating all the radiators | ||
+ | # AMO radiator: stops several times during the retracting. | ||
+ | # Planned work during MCC energy change (starting 6am next Monday): | ||
+ | #* Be target installation (3 days). | ||
+ | #* Checking cables for TAGH 229 and 230, (Chris and Stuart). | ||
+ | # Solenoid He level is at 33%. | ||
+ | # Ken's plan on the coherent peak test: | ||
+ | #* For 30 Mins: Set up new peak settings for PARA and PERP, and establish the beam current required to keep the rates on the hodoscope down. | ||
+ | #* Once the peak setting is established we could the do these any time: | ||
+ | #** 1Hr run on PARA | ||
+ | #** 1Hr run on PERP |
Latest revision as of 09:35, 5 December 2018
Contents
Friday, Nov 30 at 8:45
- Comp Cal installation
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2am (due to radiation damaged valve position sensor).
- FCAL is down:
- Monitoring current draw on CAN bus [Matt]
- Rapid access is arrange between 10am - noon.
- Run Plan:
- https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf
- Beam requested today: 2nA on the foil.
- Cryo
- solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314
Monday, Dec 3 at 8:45
- Comp Cal Status
- Friday: cell-by-cell calibration
- Friday overnight: successful TAC run
- Saturday: completed cell-by-cell calibration
- Saturday overnight: no beam / TAC rate issue (due to beam characteristic change).
- Sunday: completed voltage matching
- Sunday overnight: voltage crosscheck data taken
- Data ready?
- Target
- Be target installation (tentative date is Thursday)
- LH2 Cooling and when?
- Empty target data during the target colling process?
- Accelerator
- Beam study 9am-2pm
- Energy change next Monday
- Planned hall access:
- Alex: hall tour at 1:30
- Sean/Stuart: checking the cable for the tagger hodoscope (not scheduled)
- Hall tour tomorrow?
- Other idea of using the low current beam
- Ken: The coherent peak test near the tagger hodoscope low energy boundary (preferably after the energy change) with ~2nA current
Tuesday, Dec 4 at 8:45
- Comp Cal Status
- LED signal can be seen by all but one channel .
- Empty target run overnight, snake pattern voltage check (now is on the third row)
- Sasha's log entry: https://logbooks.jlab.org/entry/3634609
- Target installation Plan for next Monday: 70 hours (Planed by Chris, modified by Tim and Alexandre)
- Hall opens at 8am Monday;
- With Radcon support, Hall D techs remove beamline and retract target cryostat;
- Hall D techs uncable and remove start counter from cryostat;
- Target Group secures H2 gas, inerts the target piping, and bleeds vacuum chamber to atmospheric pressure;
- With Radcon support, Target Group removes foam portion of cryostat;
- With Radcon support, TG removes superinsulation around target cell;
- With Radcon support, TG removes LH2 target cell;
- TG mounts beryllium sample in place of LH2 cell;
- Location of Be sample fiducialized against outside markers on cryostat;
- Foam portion of cryostat is put back in place, vacuum pumps on;
- Start counter put back in place, cables attached;
- Target inserted into solenoid
- Survey adjusts position in solenoid
- Beamline assembled and pumpe
- TAGM trigger issue (Richard): https://logbooks.jlab.org/entry/3633836
- TAGH HV/signal cabling check (requested by Sean).
- A hardware expert is required to go with Stuart.
- MCC promised to looked into the low current monitor at 5C11B
Tuesday, Dec 4 at 8:45
- Day and swing:
- Snake pattern voltage scan (50% completed).
- Hall access to check the solenoid He level probe. (Bobby and Mark)
- Overnight: 20nA on 1x10^-4 radiator, LH2 production data, lost few hours of data taking due to issues:
- Issue 1: AC gain changed
- Issue 2: 1x10^-4 radiator (ion chamber was not calibrated).
- Problem resolved around 4am, MCC currently calibrating all the radiators
- AMO radiator: stops several times during the retracting.
- Planned work during MCC energy change (starting 6am next Monday):
- Be target installation (3 days).
- Checking cables for TAGH 229 and 230, (Chris and Stuart).
- Solenoid He level is at 33%.
- Ken's plan on the coherent peak test:
- For 30 Mins: Set up new peak settings for PARA and PERP, and establish the beam current required to keep the rates on the hodoscope down.
- Once the peak setting is established we could the do these any time:
- 1Hr run on PARA
- 1Hr run on PERP