Difference between revisions of "Run Planning Meeting Notes, Dec 12-Dec 20, 2019"
From GlueXWiki
(→Wednesday, Dec 17 at 08:45) |
|||
(2 intermediate revisions by one other user not shown) | |||
Line 120: | Line 120: | ||
#** https://logbooks.jlab.org/entry/3755074 | #** https://logbooks.jlab.org/entry/3755074 | ||
− | == Wednesday, Dec | + | == Wednesday, Dec 18 at 08:45 == |
# Past 24 hours: | # Past 24 hours: | ||
#* DIRC Gem/TRD the beam right position completed collecting 6M trigger. | #* DIRC Gem/TRD the beam right position completed collecting 6M trigger. | ||
Line 126: | Line 126: | ||
#* Two out of four special DIRC configuration is completed. | #* Two out of four special DIRC configuration is completed. | ||
#* Progress on setting the high rate test triggers and DAQ, but not completed. | #* Progress on setting the high rate test triggers and DAQ, but not completed. | ||
+ | #* Raw mode data 71133-71156: https://logbooks.jlab.org/entry/3755376 | ||
+ | #* TAGM is fixed: https://logbooks.jlab.org/entry/3755595 | ||
# Issues | # Issues | ||
+ | #* root_spy: https://logbooks.jlab.org/entry/3755549 | ||
#* Data corruption issue in the beginning of the run. | #* Data corruption issue in the beginning of the run. | ||
# Task for today | # Task for today |
Latest revision as of 10:15, 19 December 2019
Contents
Thursday, Dec 12 at 08:45
- Last 24h:
- DIRC Gem data beam center data collected 1M trigger
- Diamond 0/90 aligned at 8.6GeV.
- 5 hours of good running overnight (0.8B trigger collected)
- Issue:
- DAQ crash
- DAQ issues (of manifest variety)
- DIRC reference signal found in the stand alone configuration
- Alarms for FDC HV
- TAGM translation table
- Data corruption issue in the beginning of the run.
- rcdb event number issue.
- DAQ crash
- Task for today
- Setting up high current test (Sasha)
- CPP test crash (Dave)
- Plan for later
- No sping dance today. Spin dance maybe on Friday whiteboard
- Monitoring
Friday, Dec 13 at 08:45
- Last 24h:
- DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
- The CPP test (1 hour) run was completed
- Overnight collected ~3 hours of DIRC commissioning data.
- Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV
- 30 mins Raw mode data taken:
- hd_root crash: https://logbooks.jlab.org/entry/3752755
- Issues:
- DAQ crash
- DIRC reference signal found in the stand alone configuration
- TAGM translation table
- Data corruption issue in the beginning of the run.
- rcdb event number issue.
- Monitoring anomaly observed by Alex:
- ST Timing: https://logbooks.jlab.org/entry/3752783
- normalization to amorphous run for beam monitoring in rootspy updated: https://logbooks.jlab.org/entry/3752755
- Task for today
- Hall Work
- Relocate GEM/TRD
- Installing additional flash module (Sasha)
- Setting up high current test? (Sasha)
- TOF: Beni
- Profiler & FCal prototype: Ashark & Vlad
- Low current ~3nA run (1 hour)? (Sasha)
- Hall Work
- Plan for later
- Spin dance no longer scheduled
- Potential Hall C path change on Tuesday (Change GEM/TRD position again)
- whiteboard
- Monitoring
Monday, Dec 16 at 08:45
- Weekend running:
- DIRC Gem data beam left configuration collected additional 6M trigger.
- Xenon gas test is included
- https://logbooks.jlab.org/entry/3754114
- https://logbooks.jlab.org/entry/3754118
- High rate trigger test completed
- Bottle neck: DIRC at 250-300 nA.
- Sasha is preparing a special trigger configuration
- DIRC commissioning data:
- Nominal configuration (Moroc threshold=100)~3B triggers
- Moroc threshold=50 ~ 2B trigger (this weekend)
- DIRC Gem data beam left configuration collected additional 6M trigger.
- Issues
- PS trigger (scalar) missing
- Root_spy crash
- Gluon05 monitor blinking issue
- DIRC reference signal still cant be used
- TAGM translation table
- Data corruption issue in the beginning of the run.
- DIRC issues:
- Missing tiles: https://logbooks.jlab.org/entry/3754151
- Anomaly DIRC occupancy: https://logbooks.jlab.org/entry/3753658
- Gluon04 desktop manager
- Task for today
- Hall Work
- Relocate GEM/TRD to beam right position
- Installing additional flash module (Sasha)
- Hall Work
- Plan for later
- More test will be after Wednesday
- Current TAC run and TAGM accidental run.
- whiteboard
- Monitoring
- More test will be after Wednesday
Tuesday, Dec 17 at 08:45
- Weekend running:
- DIRC Gem/TRD moved to the beam right position collected 3M trigger.
- More DIRC commissioning data at the nominal configuration is collected ~ 4B trigger
- A new equalized gain setting is used (changed 6:51am, Run 71112).
- BCAL flash module replace, and the old module is used on DIRC.
- Issues
- PS trigger (scalar) missing
- Data corruption issue in the beginning of the run.
- DIRC HV issue:
- DIRC lower photon yield issue:
- Task for today
- DIRC HV channel swap
- 30 min Raw mode data for the flash electronics debugging
- TPOL firmware debugging
- Plan for later
- Hall B beam path change tomorrow, beam intruption for 2 hours (starting 8am).
- More test will be after Wednesday
- Current TAC run and TAGM accidental run.
- whiteboard
- Monitoring
Wednesday, Dec 18 at 08:45
- Past 24 hours:
- DIRC Gem/TRD the beam right position completed collecting 6M trigger.
- Gem/TRD test is completed in full.
- Two out of four special DIRC configuration is completed.
- Progress on setting the high rate test triggers and DAQ, but not completed.
- Raw mode data 71133-71156: https://logbooks.jlab.org/entry/3755376
- TAGM is fixed: https://logbooks.jlab.org/entry/3755595
- DIRC Gem/TRD the beam right position completed collecting 6M trigger.
- Issues
- root_spy: https://logbooks.jlab.org/entry/3755549
- Data corruption issue in the beginning of the run.
- Task for today
- Completing setting up the high current test
- Plan for later
- TAGM accidental run: 5am tomorrow.
- Current TAC run immediately follows.
- whiteboard
- Monitoring
- Wave forms from Beni: https://logbooks.jlab.org/book/halld
- https://logbooks.jlab.org/entry/3755635