Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Issues for the Readiness Review
- Budget
- Mechanical Design and Installation
- Trigger
- CPP Test and TOF Rates (Ilya)
- Running CPP and NPP together
Trigger
Discussion topics with Sasha
- CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
- Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
- We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
Documentation for Review
- CPP Jeopardy Presentation PAC 48 September 24, 2020