Difference between revisions of "CPP and NPP Readiness Review"
From GlueXWiki
(→Report and Response) |
(→Comments to Response 2) |
||
Line 55: | Line 55: | ||
=== Comments to Response 2 === | === Comments to Response 2 === | ||
* [[Media:ERR Comments2.png | ERR Committee comments to response 2]] | * [[Media:ERR Comments2.png | ERR Committee comments to response 2]] | ||
+ | |||
+ | === Response 3 === | ||
+ | * Preliminary results from cosmic-ray test in EEL126 | ||
+ | * [https://logbooks.jlab.org/entry/3940051 Efficiency summary for Arwen and Denethor (retest)] | ||
+ | * [https://logbooks.jlab.org/entry/3932878 Efficiency summaries for all chambers] | ||
+ | * [https://logbooks.jlab.org/entry/3937367 Arwen R188 analysis and voltage scan] | ||
+ | * [https://logbooks.jlab.org/entry/3929607 Bilbo R166 and Celeborn R169 analysis] | ||
+ | * [https://logbooks.jlab.org/entry/3936817 Denethor analysis R184] | ||
+ | * [https://logbooks.jlab.org/entry/3932758 Eowyn analysis R171] | ||
+ | * [https://logbooks.jlab.org/entry/3932293 Frodo analysis R175] | ||
+ | * [https://logbooks.jlab.org/entry/3922895 Galadriel analysis R157] | ||
== Additions to Standard Equipment == | == Additions to Standard Equipment == |
Revision as of 16:31, 10 November 2021
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Planning for Experiment
Outline Presentations (February 10, 2021)
- https://bluejeans.com/195964581 Bluejeans connection for Open Session
- Reviewers:
- Stepan Stepanyan (chair+muon detector)
- Alexandre Cansonne (Trigger)
- Brad Sawatzky (Tracking System -MWPC)
- Chris Keith (Target)
- Robin Wines (Installation)
- Mikhail Kostin (RadCon)
- Edy Nissen (Beamline)
- Javier Gomez (Observer)
- Ed Folts (Observer)
- Agenda
- 08:15-08:45 Executive session
- 08:45-09:35 (30+20) Overview of Experiment and Setup (Charges: 1, 2. 5, 8) -- Rory Miskimen
- 09:35-10:25 (30+20) Engineering Design, Fabrication, Operation and Installation of CPP Hardware (Charges: 2, 3, 4) -- Tim Whitlatch
- 10:25-10:45 Coffee break
- 10:45-11:15 (20+10) Project implementation, resources and schedule (Charges: 3, 6, 7, 9) -- Elton Smith
- 11:15-14:30 Lunch and Executive Session
- 14:30 Closeout
Report and Response
Report
Response 1
- Point-by-point Response
- Timelines and Responsibilities
- Fabrication and Performance of the MWPC GlueX-doc-5080
Comments to Response 1
Response 2
- MWPC Efficiency
- Schedule Status
- CPP-NPP Schedule Status 5/11/2021. The following two references show that the new hdgeant4 simulation is operational and working:
- Log Entry 3876633 Histogram of muon hits from hdgeant4 simulation.
- Tracking / extrapolation to MWPCs Preliminary studies of extrapolation of FDC tracks to MWPCs
Comments to Response 2
Response 3
- Preliminary results from cosmic-ray test in EEL126
- Efficiency summary for Arwen and Denethor (retest)
- Efficiency summaries for all chambers
- Arwen R188 analysis and voltage scan
- Bilbo R166 and Celeborn R169 analysis
- Denethor analysis R184
- Eowyn analysis R171
- Frodo analysis R175
- Galadriel analysis R157
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
- Move tagger microscope to cover 6 GeV coherent peak
Documentation for Review
- PAC Documents
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020
- NPP Presentation to PAC 48 August 13, 2020
- TOF Trigger
- Draft Documents
- Released Drawings
- Installation Schedule
- Wiki Pages for further reference