Difference between revisions of "Run Planning Meeting Notes, November 25 - December 1, 2021"
From GlueXWiki
(→Thursday November 25) |
|||
Line 15: | Line 15: | ||
#* run on carbon at 150nA´ | #* run on carbon at 150nA´ | ||
#* Rotate the radiators and use both configurations | #* Rotate the radiators and use both configurations | ||
− | ##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator) | + | ##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the dumpling) |
#* Take at least two amorphous runs | #* Take at least two amorphous runs | ||
# Analysis update | # Analysis update |
Revision as of 11:15, 25 November 2021
Thursday November 25
- Last 24h:
- Solenoid ramped down, cryotarget removed and replaced with the carbon foils (work finished ~12:00)
- Beni started to ramp up the solenoid. ~19:00 tune beam was delivered into the hall. After harp scans and finishing with the solenoid ramp up, DAQ was prepared for production.
- First Carbon run at 150nA started ~11:30
- Issues:
- DAQ computer was frozen during the afternoon, so a hot reboot was necessary. That could cause some communications issues with some racks, especially with the Pair Spectrometer.
- Besides that issue, I suggest limiting the DAQ computer just for CODA. I had the experience that the computer gets freeze or lose the GUI when is used with other apps.
- Not an experimental issue, but important, the mouse from the conference room has disappear.
- run on carbon at 150nA´
- Rotate the radiators and use both configurations
- It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the dumpling)
- Take at least two amorphous runs
- Analysis update