Difference between revisions of "JEF meeting, March 11, 2022"
From GlueXWiki
Line 8: | Line 8: | ||
** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped) | ** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped) | ||
** Chris continues to make brass strap assemblies | ** Chris continues to make brass strap assemblies | ||
− | ** Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into | + | ** Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into PMT housings) |
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month) | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month) |
Revision as of 00:15, 11 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
- Chris continues to make brass strap assemblies
- Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into PMT housings)
- Module fabrication -- Sasha
- Modules fabricated by Arshak and Sasha (list on Google Drive) (grand total 115, fabricated in about a month)
- Fabricated modules in TEDF
- Status of fabrication
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- FCAL2 Insert Efficiency in Phi -- Azizah