Difference between revisions of "JEF meeting, March 11, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 7: | Line 7: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped) | ** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped) | ||
− | ** Chris continues to | + | ** Loan agreement with GWU submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab |
+ | ** Chris continues to braze brass strap assemblies | ||
** Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into PMT housings) | ** Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into PMT housings) | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha |
Revision as of 00:34, 11 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
- Loan agreement with GWU submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab
- Chris continues to braze brass strap assemblies
- Bobby has started working on honing soft iron PMT housing (some mu-metal cylinders don't fit into PMT housings)
- Module fabrication -- Sasha
- Modules fabricated by Arshak and Sasha (list on Google Drive) (grand total 115, fabricated in about a month)
- Fabricated modules in TEDF
- Status of fabrication
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- FCAL2 Insert Efficiency in Phi -- Azizah