Difference between revisions of "JEF meeting, July 1, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 21: | Line 21: | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 185 CRYTUR], Remaining: 442 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 185 CRYTUR], Remaining: 442 | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126] | ||
− | |||
− | |||
− | |||
**Students reports | **Students reports | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 09:26, 1 July 2022
Meeting time and location=
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Update on eta to ggpi^0 -- ig
- Preparation of parts for FCAL2 modules -- Sasha
- Preparation of parts[1][2][3]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Module fabrication
- Wrapped CRYTUR crystals: 559 (60 + 185 + 166 + 80 + 68)
- All currently available (consider to borrow some spares from NPS)
- Students reports
- Fun time
- Preparation of parts[1][2][3]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 746
- All 561 SICCAS
- 185 CRYTUR, Remaining: 442
- Clean room EEL126
- Students reports
- Light Monitoring System -- Arshak