Line 25: | Line 25: | ||
*** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg] | *** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg] | ||
*** Work on amending safety docs | *** Work on amending safety docs | ||
− | + | ** All students will leave during this week | |
− | * | + | *** <span style="color:#FF0000"> Great job during this summer </span> |
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 23:40, 18 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals. [1] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].
- currently available/ordered + CCAL: 1593 + (9) (need more spares)
- Meeting with the DSG group: Mindy and George will continue working on the project in September
- Preparation of parts[2][3][4]. Remaining components:
- 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
- 200 light guides, will be delivered during a couple of next weeks.
- 400 PMT housings, expect to receive during next two months (bottleneck now)
- Wrapped CRYTUR crystals: 682
- All currently available
- Crystals. [1] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].
- Module fabrication -- Sasha
- Received 72 PMT housings from Tim a couple of days ago; used practically all of them
- Status of fabrication
- Fabricated modules: Total 1206 (a new milestone)
- All SICCAS 576 SICCAS
- 630 CRYTUR, Remaining: 52
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Work on amending safety docs
- All students will leave during this week
- Great job during this summer
- Light Monitoring System -- Arshak