Difference between revisions of "Run Planning Meeting Notes, September 1 - September 7, 2022"
From GlueXWiki
(Created page with "Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394) [https://cebaf.j...") |
|||
Line 12: | Line 12: | ||
=== Past 24 hours === | === Past 24 hours === | ||
* Be target inserted | * Be target inserted | ||
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4036058 5 FCAL bases replaced] (Rebecca) |
* Electric work | * Electric work | ||
− | ** AC & SC (Nick) | + | ** AC & SC Electronics (Nick) |
+ | * AC calibration, new lock positions | ||
* More details can be found here | * More details can be found here | ||
** [ 0400-1000 01/09] | ** [ 0400-1000 01/09] | ||
** [ 2200-0400 31/08-01/09] | ** [ 2200-0400 31/08-01/09] | ||
− | ** [ 1600-2200 31/08] | + | ** [https://logbooks.jlab.org/entry/4036198 1600-2200 31/08] |
** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08] | ** [https://logbooks.jlab.org/entry/4036033 1000-1600 31/08] | ||
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08] | ** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08] | ||
=== Issues === | === Issues === | ||
− | + | * FDC and CDC alarms | |
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === | === [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] === |
Revision as of 20:45, 31 August 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Thursday, September 1
Past 24 hours
- Be target inserted
- 5 FCAL bases replaced (Rebecca)
- Electric work
- AC & SC Electronics (Nick)
- AC calibration, new lock positions
- More details can be found here
- [ 0400-1000 01/09]
- [ 2200-0400 31/08-01/09]
- 1600-2200 31/08
- 1000-1600 31/08
- 0400-1000 31/08
Issues
- FDC and CDC alarms
Plan
- Take data with B-field
- Trigger study (Sasha)
- Detector checkout (raw mode for ADCs & pi0 for FCAL)
- Physics production
The hot checkout page
Readiness Check List
- Solenoid (Eugene/Beni)
- Start the run with magnetic field on
- Surveys (Tim/Mark)
- FCAL survey
- TOF survey
- ST survey
- TAGM
- TAGH
- Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
- Survey CCAL after it's installed in the Hall
- DAQ (Sergei).
- Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
- Trigger (Alex S.)
- Check physics triggers
- Run CCAL trigger when the detector is installed in the Hall
- Connect / check CCAL LED and alpha triggers
- Beam line
- Install He beam pipe between FCAL and CCAL (Tim)
- Install led shielding wall in front downstream the PS (Tim)
- Radiator status
- Check amorphous radiator
- Tagger hodoscope (A. Somov)
- Install plates with TAGH counters
- Install / check repaired TAGH countes
- Tagger microscope (Tim / Richard Jones)
- Move TAGM to the new location and rotate
- Collimator Motion (Hovanes)
- Not changed
- Active collimator detectors(Richard Jones/Alexandre Deur)
- Move active collimator to 5 mm hole
- Check
- Profiler (Hovanes)
- Not changed
- Luminosity monitor (Hovanes)
- Not changed
- Halo monitors
- Not changed
- PS system (Alex Somov)
- Not changed
- Beam line magnets (PS magnet sweeping magnet and tagger quads).
- Change filed of the PS magnet
- Polarimeter (Sebastian Cole/M. Dugger)
- Optional, not used in PrimEx
- Targets (Chris/Tim/Alexandre D.)
- LH4
- Be
- TAC (Alex Somov/Hovanes)
- Use CCAL (TAC can be used as a backup)
- Slow control (Hovanes)
- Check CCAL
- RF (Sergei)
- Not changed
- Radiation monitors (Alexandre D.)
- Not changed
- Detector systems
- ST (Beni)
- Connect cables, check dark rate
- FDC (Lubomir)
- Not changed
- CDC (Beni)
- Move CDC1 crate to the nominal position, cable up
- Check readout
- BCal (Mark D. / Elton)
- Not changed
- FCal (Mark D.)
- Check / replace bases if needed
- ComCal (Alex Somov)
- Check detector controls (Nick)
- Install CCAL platform
- Check platform motion
- Installed detector on the platform
- Connect cables
- Connect LMS
- Check detector
- TOF (Beni)
- Remove inner acrylic absorber
- ST (Beni)