Meeting Time and Place
Wednesday September 21,2022 10am At Jefferson Lab, Hall D Counting House and on Teams
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/September_07,_2022_FCAL_Insert_Installation_Meeting
- Discuss Lead Glass and crystal module removal/install - Sasha
- Crystal signal cable concept - Stephanie
- Cable mapping requirements - Fernando
- Existing cables
- New Cables
- Assembly in ESB
- Media:FCAL2_strawman_schedule.pdf
Minutes
Action Items
- Make a virtual 3D Mock up of baseline (Tim and Stephanie)
- Assume HV and LV cables come from top and bottom
- Assume signal cables are rg174 and patch in from downstream wall
- Assume signal cables come along center pipe and fan out to crystals
- Get samples of wires from Chris S. to use for model
- Develop an lead-glass module unstacking plan (Sasha)
- Criteria for category of repairs
- # of bins
- repair plan
- Get quote on RG174 cables and connectors (Chris S.)
- Come up with cable mapping plan (Fernando)