** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
** [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ] | ** [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ] | ||
+ | ** Meeting with Hovanes (Slow control) | ||
+ | **: Translation tables [https://halldweb.jlab.org/wiki/index.php/FCAL2_Crates] | ||
* '''Light Monitoring System''' -- Arshak | * '''Light Monitoring System''' -- Arshak | ||
** [https://userweb.jlab.org/~aasatury/Fcal_LMS/lms_update_march_23.pdf Update on LMS] | ** [https://userweb.jlab.org/~aasatury/Fcal_LMS/lms_update_march_23.pdf Update on LMS] | ||
* '''Simulations/Analysis''' | * '''Simulations/Analysis''' |
Revision as of 09:24, 17 March 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Available crystals:
- 1450 (modules)
- 32 (ready for fabrication)
- 40 (installed on CCAL) available on March 20
- (some CCAL crystals from the inner part will not be used for the FCAL2)
- 95 expect to receive from CRYTUR in May [1]
- Total 1617
- George (DSG group) finished with disassembling CCAL modules and removing LMS caps. Will work on preshaping ESR reflectors for CRYTUR. The oven will be ready in a week.
- Mindy (DSG group) solder wires to sockets (while waiting for crystals). More crystals will come from the CCAL during next week.
- Available crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1470 (15 modules fabricated since last week)
- Currently available for fabrication: 12
- Fabricated modules: Total 1470 (15 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- FCAL2 modules with dividers installed on the CCAL [2]
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [3]
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Meeting with Hovanes (Slow control)
- Translation tables [4]
- Light Monitoring System -- Arshak
- Simulations/Analysis